Construction Management


[ Philippines Online Resume Listing ] [ FAQ ]

Posted by on January 19, 19100 at 23:43:46:

Lawrence Sydney Anthony Attrill
I8/12 Amsterdam 11
Kota Wisata Jakarta Indonesia
attro305@indo.net.id

Objective
On Site Construction, Contracts, Supervision, Management position with a progressive international company where broad management skills and extensive construction experience can be fully utilized.

Accomplishments
 Directed and coordinated on site activities of designated projects.
 Ensured that aims, goals and objectives were accomplished in accordance with outlined priorities, schedules and budgetary constrains.
 Motivated self-starter with an aptitude for learning new skills quickly. Handles crisis situations in calm and capable manner. Able to coordinate multiple projects; can shift to cover a multitude of positions as needed.
 Develop and implement work packages for all construction disciplines, hand over to client on completion of project.
 Develop staffing plans, work, equipment and material requirement schedules.
 Contracts proactive management: civil's, building works, mechanical, landscaping, special finishes, demolition, pile driving, general equipment hire, and painting contractors.
 Consistently analyzing construction methods and material usage for ways to generate cost and time savings.
 Directed and coordinated construction office staff comprising of engineers, contracts, cost & scheduling, construction self perform staff, architects, document control, HR and secretarial staff.
 Implemented company and client environmental policies: Environmental Construction Best Management Practices for Construction
 Develop specialized building materials list for procurement, schedule required volumes and quantities for stocking warehouses for a remote construction site.
 Introduced metal stud, suspended ceiling system, metal door frames and road and footpath pavers to a remote construction site in Indonesia. Set up manufacturing equipment, develop training programs and implement same. Conclusion reduced costs to construction and maintenance for the life of the mining lease.
 Direct involvement in the procurement of concrete batching, roll forming, crushing, and paver manufacturing equipment.
 Set up maintenance shops for small construction tools and equipment; spare parts inventory, specialized tools, training program for a remote construction site in Indonesia. Benefits reduce down time significantly, reduction in capital cost using a lower stock inventory for electrical and mechanical construction tools.
Qualifications
 Thirty years of construction experience from residential housing, commercial & industrial building works, civil's, infrastructure, renovation and new fit out work to commercial, residential housing and hotel work. Project, contracts supervision and management. Self employed contractor building works turn key.
 Journeyman carpenter, qualified scaffolder and rigger class 1. Conversant with computer software and problem solving, Office works, lotus suite, limited ability using dos.

Skills
He has the ability to complete assigned projects either confined to a structured organization or an unstructured environment. He has a hands on work ethic and has achieved consistent client satisfaction without losing sight of company goals and objectives. Past experience in construction supervision, management, administrative and contracts management has enhanced his ability to successfully solve problems, communicate and stimulate a construction team environment.

Employment History
Project Manager Township Construction September 1998 to April 1999
Fluor Daniel Indonesia Batu Hijau Project Indonesia
Directed the completion of a grass roots project consisting of some 70 permanent buildings to turn key plus construction camps including roads, services and utilities. Motivation, excellent planning and communications skills built a winning team that exceeded company and client expectations.
Project closed out substantially under budget and ahead of schedule.

General Sup't Building Works October 1997 to September 1998
Fluor Daniel Indonesia Batu Hijau Project
Establish work environment for construction, QA QC, safety employees, office accommodation, computer equipment, furniture, build work shops, order necessary tools and equipment for all trades. Request specific supervision and trades people. Implement schedule for bulk ordering of; cement, sand, aggregates, road base, wear course including issues to contractors. Establish a pre-casting yard for sewer components, landscaping, road drainage. Structure teams to carry out the following works; environmental, building, plumbing, electrical, earth works, roads and landscaping works. Proactively manage and direct team leaders through daily contact and weekly schedule meetings. Monitor contractors works for compliance with relevant building codes and contract specifications.

Senior Construction Manager June 1996 to September 1997
Fluor Daniel Indonesia Jakarta
Hotel Re-furbishment. consisting of 21 floors,760 suites, 3 levels of restaurants, bars, ballroom's, reception, public areas, administration, kitchens, bakery, butchery, shopping areas, maintenance. External front and rear Porte Cochere's, landscaping, roads and drainage, parking areas.
Review and identify deficiencies; construction drawings, bills of quantities, contract conditions. Evaluate contractors and sub-contractors ability to perform, material submissions for contract and specification compliance. Pro-actively manage the performance of office staff, contracts managers and contractors. Assess progress against schedule action as required. Consult, coordinate design team on pending construction and design issues. Monitor tracking and logging of submittal's, RFI's, Architectural changes, site instruction, notice of delay. Monitor works for compliance with relevant codes, specifications and contract documents, issue non compliance notices as required. Manage specific contracts; resolve contractual and construction problems, chair contractors schedule meeting, co-ordinate with safety and design team.

Leadhand to Site Manager. January 1971 to June 1996
Various Companies Asian Pacific Region
He completed an apprenticeship in Carpentry with a reduction of six months through examination and performance reviews, night school for class 1 rigging, crane drivers permit, scaffolding and computer software use. Having worked in the residential house market as an apprentice moved on to commercial domestic renovation work. He has been involved at various positions with the construction of power stations, water intake structures, chimney stacks, lift shafts for multi story buildings, multi story column and slab construction, mining process plants, earth works, roads & building site excavation and compaction, bridge abutments and beams. Construction turn key; hospital, clinics, shopping centres, clubs and bars, various types of houses, infrastructure, fire water, potable water, sewage, electrical systems. Construction of sewer and water process plants turn key operation. Interior fit out of all types of buildings. Environmental best construction practices, river management, pile driving & testing, self employed contractor.

Education and Training


High School 4th year. Apprenticeship in Carpentry, Class 1 scaffolding, Class 1 rigger, Computer courses, CPI training, Construction safety leadership training.







[ Philippines Online Resume Listing ] [ FAQ ]