Project Manager, Quality Engineer, Inspector, Y2K


[ Philippines Online Resume Listing ] [ FAQ ]

Posted by on October 17, 1999 at 06:38:03:

Leland Lundervold
363 B 14th Ave.
Dayton, TN. 37321
423-775-5276
lnrlundervold@hotmail.com

Certifications: ANSI N45.2.6 Level II
Instrumentation and Controls, Electrical, Mechanical, Welding, Civil

Airline Transport Pilot -Multi-engine
Instructor: Airplane, Instrument, Multi-engine

Extensive training and experience in Electrical/Mechanical/Instrumentation &
Controls (I&C)/Welding, National Electric Code (NEC), Y2K, Project Management,
General construction activities, Quality Engineering, Surveillance, auditing.
Preoperational/Startup Testing, Aviation, Nuclear/Fossil power generation,
QA/QC, QE/QA Document Review. Oracle 6.0. Data Base Design & Analysis, FoxPro.


04/98 – 07/99 Tekton Resources, Project Manager
Puerto Rico Electric Power Authority, Puerto Rico. Project manager
Zeeland Board of Public Works, Zeeland MI. Project manger
Holland Board of Public Works, Holland MI. Project manager

Responsible for scheduling, budget, daily & weekly status/progress reports.
Conducted weekly meetings with client to discuss project status and scheduling.
Supervised engineers, technicians and craft personnel. Trained personnel in the
Y2K methodology and use of custom database software. Designed the custom
database scheme to be used for each client. Liaison between the client and
TAVA/RW Beck. Power generation, T&D, telecommunications, water treatment/waste
water/water distribution, distributed control systems, Business systems,
networks, personal computers, etc. including all associated systems and
equipment (i.e. SCADA, PLC’s). Developed a detailed Project Management plan for
each client.

First Energy, Stratton & Shadyside, Ohio. Lead Engineer.
Muscatine Power & Water, Muscatine, Iowa. Engineer.

Responsible for on site Y2K evaluation of plant components which may not be Y2K
(Year 2000) compliant. This data is input into a database for further evaluation
and testing. Instructed others in the use of custom database software and Y2K
methodology. Supervised engineers, technicians and craft personnel.

03/98 - 04/98 Tekton Resources, AmerenUE (Callaway). Responsible for
inspections to plant systems/components during refueling outage.

09/95 – 12/97 Duke Power company, GTS/Duratek
Responsible for inspections to plant systems.
09/97 - 12/97 McGuire Power Plant, Unit 2 Steam Generator
Replacement/refueling outage
01/97 - 05/97 McGuire Power Plant, Unit 1 Steam Generator
Replacement/refueling outage
10/96 - 01/97 Oconee Power Plant, refueling outage
07/96 - 09/96 Catawba Power Plant, Steam Generator Replacement/refueling
outage
04/96 - 06/96 McGuire Power Plant, refueling outage
09/95 - 11/95 Catawba Power Plant, refueling outage

03/95 - 09/95 Stone & Webster (Watts Bar) Responsible for construction,
startup, and plant modification inspections to plant systems and components.

07/94 - 11/94 Arctic Slope Inspection Services - Valdez Marine Terminal,
Valdez Alaska
Supervised inspection teams consisting of electrical craftsmen, Design/Field
Engineers and during a 100% inspection of the facilities at the Valdez Marine
Terminal (VMT). Generated work documents to upgrade components/equipment to
comply with current National Electric Code (NEC) and OSHA regulations.

06/94 - 07/94 GTS Duratek (Watts Bar) Quality Engineer. As a result of a
NRC violations: responsible for QE overview and analysis of Engineering
walk-down of class 1E systems. (Also 02/94 - 04/94)

11/90 - 05/93 GTS Duratek (Watts Bar) Quality Engineer.
Performed audit of site and vendor reports for recurring (real time) and
repetitive conditions to identify potential corrective action deficiencies of
systems and components. Wrote analysis and corrective action in the areas, which
did not meet, established acceptable quality levels. Responsible for accessing,
retrieving and organizing data from mainframe and personal computers. Wrote the
site trend analysis reports, and weekly & monthly QA Assessment of site
performance reports.
Responsible for developing specifications for a new computer
tracking/trending program (TRENDS) with various levels of management. TRENDS
consist of all inspection requirements (Electrical/Mechanical/I&C/Welding/NDE,
etc.), document review, assessments, surveillance's, audits etc. Completed 80
hours of Oracle training, including Advanced Oracle for developers. Developed
applications to track/trend various data at a local level while TRENDS was in
development.
Responsible for production of the Computer Graphics, Graphs, Desktop
Publishing, and various presentation projects. Instructing/Training TVA
personnel in the use of computer graphics/word processing software such as
Harvard Graphics, MS Word, WordPerfect, etc. Made recommendations and ordered
computer equipment for the Quality Assurance organization. Wrote and modified
custom Dbase applications for tracking special projects.


10/89 - 10/90 Metro Airlines (Eastern Metro Express) - Airline pilot.
Performed flight officer duties for Eastern Metro Express, based in Atlanta, GA.


02/89 - 05/89 Bell Power Generation. Performed inspections and surveillance
on a new offsite power installation including all control room and diesel
generator modifications and testing. Conducted inspections on switchgear
modifications and testing at Ginna Station, Oswego NY.


01/87 - 02/89 Freelance Corporate Pilot and Flight Instructor. Cuyahoga Co.
Airport, Richmond Heights, OH. Managed flight instructors.


08/86 - 12/86 Senior Quality Engineer - Westinghouse (Aerospace Marine
Division) - [Mechanical, Electrical, Instrumentation] Assigned to the Simulated
Underwater Partial Launch System (S.U.P.L.S. II) on the Trident II missile
project, San Clemente Island, CA. Approved procedures and procedure changes.
Audited all pre-launch system parameters to ensure compliance with design
specifications, including electrical, Instrumentation, and Mechanical. Performed
overview of valve disassembly and reassembly. Walk down of system configurations
prior to each launch. S.U.P.L.S. II was a project to verify the mathematical
data of the closure to assure unimpeded missile launch


04/86 - 08/86 Illinois Power Company. Performed inspection and surveillance
of calibrations and loop integrity. Covered, Leak Test, valve & actuator
disassembly and reassembly (rebuilding/packing), switchgear modifications and
testing. Verified environmentally qualified equipment met specifications.


02/86 - 04/86 Union Electric. Performed Electrical, I&C, welding inspections
during outage at Callaway Nuclear Plant. Including modifications of the
Westinghouse 7300 system.


11/85 - 02/86 Public Service of Colorado. Contracted to develop and write a
program/procedures to monitor key steps in surveillance tests
(Mechanical/Electrical/I&C/Welding/NDE) associated with Plant Technical
Specifications, to meet the criteria set by the NRC at Fort St. Vrain. Performed
document review of the completed work packages once this program was put into
effect.


04/85 - 11/85 Cleveland Electric Illuminating Company. Performed QA
surveillance of startup system testing, trouble shooting, instrumentation
calibrations, loop testing, leak test, PC board modifications etc. Performed
surveillance of environmentally qualified equipment.


02/85 - 03/85 Public Service Electric and Gas. Performed Electrical, I&C,
and welding inspections.


09/84 - 10/84 Power Authority of New York. Performed Electrical, I&C, and
welding inspections. Verified proper performance of MOV's. Covered the
installation and testing of an auxiliary generator excitation system.


11/83 - 09/84 Illinois Power Company. Audited the validity of the
construction QC program, through component walk down, surveillance,
over-inspections, and document review, for compliance with Plant Procedures and
Technical Specifications, all disciplines.


06/83 - 10/83 Pacific Gas and Electric. Performed Electrical, I&C, and
welding inspections during construction for the utility company.


04/83 - 05/83 Sacramento Municipal Utilities District. Performed Electrical,
I&C, and welding surveillance of control room modifications.


10/82 - 03/83 Florida Power and Light. Performed Plant wide walk down of
Electrical/Mechanical Supports/system components.


06/81 - 06/82 Louisiana Power and Light. Start-up Technician. Performed
startup testing of various systems at Waterford III Nuclear Plant.


11/78 - 05/81 Bechtel Power Company. Beulah, ND, Journeyman Electrician, I&C
technician. Performed electrical construction activities. Conducted
Preoperational and Startup Testing on various systems, systems trouble shooting.
Calibrated the E. H. Controller's (Auxiliary Turbines), and various
Instrumentation calibrations and motor operated valve setup and testing






[ Philippines Online Resume Listing ] [ FAQ ]