Electrical/Instrument or Instrument & Controls Designer


[ Philippines Online Resume Listing ] [ FAQ ]

Posted by on January 21, 19103 at 13:58:41:

JASON PAUL WILLIAMS
ELECTRICAL/INSTRUMENTATION DESIGNER

PERMANENT 6211 S. 239th Street
ADDRESS: Apt. F-105
Kent, WA 98032-2976
(253) 852-4845
E-Mail WilliamsSon2@aol.com

BIRTH: June 30, 1950; San Francisco, CA
MARITAL STATUS: Single
HEALTH: Good
SOCIAL SECURITY NO: 567-68-7132

Hold License from Autodesk: AutoCAD 2000

SUMMERY OF WORK EXPERIENCE:

Over 10 years (20,800 hours) of solid AutoCAD 10, 11, 12 for DOS, and 12, 13, 14 for Windows and AutoCAD 2000 and 2002. Over thirty years design experience in the electrical and instrumentation fields. Supervision and verification of instrument installation and construction activities. Monitor all construction and engineering activities, by way of directives. Extensive control panel layout and design. Responsible for complete loop check, instrument check, control panel check and acceptance. The design and preparation of electrical and pneumatic loop drawings, complete plant installation details and drawings; to include instrument index, Process Logic Controller I/O, Distributive Control System I/O, layout and design of electrical & instrument plan drawings, conduit and cable tray routing and installation, air layout and routing drawings, electrical and instrument locations and orientations, mounting and support details for instruments, cable tray, conduit and air piping, Bills of Material, graphic display panels, material take-off, pull and terminal boxes. The coordination and interface with architectural, piping and civil/structural drawings to achieve plant design per project specifications. The design and preparation of process control and electrical ladder, wiring and connection drawings. Extensive field
experience to interface new projects with existing plant equipment.

EXPERIENCE:

December 2002 to January 10, 2003
Under contract to Parker, Messana & Associates, Inc., Federal Way, Washington
Senior Electrical Designer - Design for Security Upgrade to include Turnstiles, Security Card Readers, Video Cameras, Security and Parking Area Lighting for King County South Plant Waste Water Treatment Facility.

July 2001 to August 2002
Under contract to Anvil Corporation, Bellingham, Washington
Control Systems Designer - Instrument Design for Gas Injection Compressor Project (GEX), Oil Production, Gas Injection and Water Injection Wells at North Slope for Phillips Alaska, Inc.

January 2001 to July 2001
Under contract to Willamette Industries, Inc., Portland, Oregon
Instrument Designer - Instrument locations for Paper Machine in Kingsport, Tennessee

September 2000 to December 2000
Under contract to Industry & Energy Associates, LLC., Portland, Maine
Electrical Designer - Motor Control Wiring Diagrams for Co-Generation project.

February 1997 to July 2000
Black & Veatch Pritchard, Overland Park, Kansas
Senior Instrument Designer - Design for Coke Gasification to Ammonia Project for Farmland Industries, Inc., El Furrial Gas Injection Project, Acogas Facilities for Wilpro Energy Services and LaRose Gas Processing Plant, Paradis Fractionation Plant for Discovery Producer Services, LLC.

February 1996 to October 1996
Under contract to Fluor Daniel, Inc., Richland, Washington
Electrical Designer - Complete re-design of SNF Canister Storage Building for Westinghouse Hanford Co.

January 1995 to January 1996
Under contract to Kaiser-Hanford, K Basins Fuel Storage Facility, Richland, Washington
Principal Electrical Designer - System walk-down, As-Found Redlines, DDS documents and Updating of all system drawings to current configuration and
specifications.

June 1994 to December 1994
Under contract to Westinghouse-Hanford, Richland, Washington
Senior Electrical Designer - Upgrade of 242-S Alarm System for waste tank storage area.

November 1992 to June 1994
Under contract to Allied-Signal, Inc., Chesterfield, Hopewell Plants, Richmond, Virginia
Electrical/Instrumentation Designer - Design for expansion of Spindraw and Spindye production facilities, extensive Haz/Op P&ID work and created piping P&ID symbol library.

October 1983 to October 1992
Under contract to Chevron - USA, San Francisco & Bakersfield, California
Instrumentation Designer - Design for Geothermal plant, Co-Generation plants(3), Water plants(3), Oil Cleaning plants(2), Gauge Settings and Sump Eliminations.

July 1983 to October 1983
Under contract to Hughes Research Center, Santa Barbara, California
Instrumentation Field Designer - Complete re design of De-ionized Water system for I.C. manufacturing.

June 1982 to February 1983
Under contract to Ebasco Services, Taft, Louisiana - Waterford III Nuclear Plant
Instrumentation Designer - Inspection, material verification, documentation, redesign and drafting of existing instrument installations. Coordination with crafts, Q.A. and Q.C. to modify or change existing installations utilizing NCR's, FCR's and Engineering Redlines to comply with design parameters.

February 1982 to June 1982
Under contract to Catalytic, Inc., Charlotte, North Carolina
Instrumentation Designer - Design for expansion of polyester production facility for Fiber Industries, Inc. in Palmetto, South Carolina.

August 1981 to February 1982
Under contract to Monsanto Enviro-Chem Systems, St. Louis, Missouri
Instrumentation Designer - Design for 2,000 ton per day Sulfuric Acid plant and Turbo-Generator system for Conserv in Nicholes, Florida.

October 1980 to August 1981
Under contract to Upjohn Company, Kalamazoo, Michigan
Instrumentation Designer - Write instrument specifications and purchase for instrument installations of new and modernization of existing process control systems.

October 1979 to October 1980
Under contract to Holmes & Narver, Inc., Orange, California
Instrumentation Field Designer - Review all instrumentation drawings and monitor all instrument construction activities. Write directives for all field changes and supervise field routing of all instrument tubing for 125,000 barrels/week expansion for Anheuser-Busch, Inc. - Los Angeles Brewery, Van Nuys, California.

April 1979 to October 1979
Under contract to Monsanto Company, Nitro, West Virginia
Instrumentation Designer - Design of instrument installations for modernization of existing plant process control systems.

September 1978 to April 1979
Under contract to Bechtel Power Corp., Midland, Michigan
Instrumentation Designer - Design for Consumers Power Company of Midland Nuclear Generating Stations.

August 1977 to September 1978
Under contract to American Oil Company, Chicago, Illinois - Whiting Refinery
Instrumentation Field Designer - Construction liaison, instrument installation check and control panel check and acceptance for Catalyst Cracking control consolidation.

July 1976 to August 1977
Under contract to Arthur G. McKee & Company, St. Louis, Missouri
Instrumentation Lead Designer - Design for Monsanto Agricultural, Petro-Chemical and Polymer Divisions.

January 1968 to July 1976
Ehrhart, Division of Procon, Inc., Los Angeles, California
Instrumentation Project Designer - Design for U.S. Borax, Newhall Refining Co., Cyprus Mines, Douglas Oil Co., Continental Oil Co. and Murphy Oil Co.






[ Philippines Online Resume Listing ] [ FAQ ]