Posted by on May 26, 19102 at 22:40:55:
RESUME
CONTACT DETAILS
Name Narciso C. delos Reyes
Address 244 Paraiso St. Casimiro Village Phase 2
Las Pinas City, Philippines 1740
Home Phone :00632 – 8728578
Mobile Phone: 0063 - 9172047981
Email: nley@edsamail.com.ph
Position Applied For Construction Supervisor(Instrumentation)
Work Summary Work with oil and gas industry,
onshore and offshore. Involve in construction,
commissioning and maintenance. Wellhead Surface and
Subsurface Safety System.
Work Experience
Hyundai Engineering and Construction – Qatar LNG / Qatar
Start Date January 2001
End Date – May 2001
Position – Instrument Supervisor
Coordinate with other discipline in monitoring and reviewing engineering drawing . Prepare technical documents including data sheets and requirements for material, testing and requisition. Participate in coordination meeting with contractor and vendor. Review updated drawing for the installation and ensure workers compliance with installation procedure. Monitor subcontractor’s performance on the control of labor construction equipment and materials and advices for improving shortcomings.
Serck Controls Ltd. – GIGTC / Bangladesh
Start Date – June 1999
End Date – October 2000
Position – Instrument Supervisor
Supervised and monitor technical personnel in the installation of SCADA instruments and equipment in power plant and fertilizer plant and pipeline valve station. Monitor and
appraised construction work for conformance with engineering drawing and specification
of owners standard and applicable codes. Review and appraise contractor construction plan and schedule. Evaluate performance of contractors organization and supervision.
Provide technical training to local workers.
Edward & Sons – Petronas / Malaysia
Start Date – February 1999
End Date – March 1999
Position – Instrument Technician
Installed process instruments. Modified pneumatic control panel. Overhaul valves and
actuator. Perform other duties assigned.
MIESCOR – First Gas Power Corp./ Philippines
Start Date – December 1998
End Date – February 1999
Position – Instrument Foreman
Supervised and monitor technical personnel in performing their duties. Lead fitters and technicians in the installation of instruments in boiler area. Review all drawing.
Implement safety procedure to correct unsafe working condition. Doing material take off.
Conduct weekly tool box meeting.
Hyundai Doz – MLPG / Malaysia
Start Date – May 1998
End Date – August 1998
Position – Instrument Technician
Assigned in electrical/instrument section. Commissioning of FMC loading arm control system. Perform other duties assigned.
Cegelec – Total Exploration and Production / Thailand
Start Date – April 1998
End Date – May 1998
Position – Instrument Technician
Commissioning of Nouvo Pignone gas compressor and GE LM 2500 gas turbine. Installation and loop checking of process instruments.
Trans Asia Philippines – JG Summit Petrochemical Corp. / Philippines
Start Date – January 1998
End Date – March 1998
Position – Instrument Supervisor
Check all instruments and developed specification for non standard apparatus according to engineering data. Coordinate technical personnel in performing inspection to ensure workers compliance with engineering standard and specification. Developed and
implement safety procedure to correct unsafe environmental working condition and educate worker to danger in plant through safety first campaign. Evaluate performance of the contractor construction organization and supervision.
Mitsubishi Heavy Industry – JG Summit Petrochemical Corp. / Philippines
Start Date – May 1997
End Date – January 1998
Position – Instrument Supervisor
Supervise, monitor and coordinate technical personnel to ensure workers compliance with applicable codes and engineering practice. Provide support to project studies and proposal. Supervise subcontractor in the installation of instruments and equipment.
Coordinate with engineering team to resolve technical issues or other specification related issue. Review and appraise contractor construction plan and schedule.
Tahiron Enterprise – SMDS / Malaysia
Start Date – September 1996
End Date – November 1996
Position – Instrument Technician
Involve in plant changes and modification of instrument controls. Overhaul, pressure test and calibration of control valves. Perform other duties assigned.
Tyco Engineering – MLNG Dua / Malaysia
Start Date – October 1994
End Date – March 1996
Position – Instrument Technician
Installed and commissioned process instruments. Loop checked and assist functional and logic test. Overhaul, pressure test and calibration of control valves. Perform other duties assigned.
Essar Oil Ltd. – ONGC / India
Start Date – March 1994
End Date – April 1994
Position – Instrument Technician
Installed and loop check process instruments. Installed and terminate cable. Modified tubing runs. Perform other duties assigned.
MIESCOR – Enron Power Plant / Philippines
Start Date – October 1993
End Date – December 1993
Position – Instrument Foreman
Supervise and monitor technical personnel in the installation of instrument as per drawing. Tagging of instrument tapping point. Review instrumentation
drawing. Conduct weekly tool box meeting.
Euro Mechanical – Adgas / Abu Dhabi
Start Date – February 1993
End Date – July 1993
Position – Instrument Technician
Installed process instrument, cable tray, cable impulse line and supports. Perform other duties assigned.
Baker CAC – Kuwait Oil Co. / Kuwait
Start Date – August 1987
End Date – August 1992
Position – Instrument Technician – Wellhead
Installation, commissioning and maintenance of onshore wellhead surface and subsurface safety system. In depth knowledge of wellhead and Xmas trees. Good understanding of Baker CAC and Otis wellhead control panel and the operation of surface and subsurface controlled valves. Initiate preventive maintenance according to set procedure. Capable of performing week end duties. Operate wellhead as per operation department required. Generate daily report. Overhaul control valves, pneumatic and hydraulic actuators.
M. Al – Mojil Est. – Aramco / Saudi Arabia
Start Date – May 1976
End Date – December 1985
Position – Instrument Technician – Wellhead
Installed and commissioned offshore Baker CAC wellhead surface and subsurface safety system. Overhaul valves, pneumatic and hydraulic actuators. Responsible in the modification and upgrading the existing system in all ARAMCO offshore oilfield. Pre commissioning the complete system. Perform other duties assigned.
Training and Seminar
Sribima Maritime Training Center
Combined Sea Survival and Offshore Safety Procedure
Basic Firefighting and Self Rescue
Helicopter and Underwater Escape Training
MLNG Training Center
Permit To Work System
Basic Knowledge on H2S
Meralco Foundation
Instrumentation Career Seminar
SCADA Computer Fundamentals
SCADA for Plant Operators