ARCHITECT / CaDD Draftsman
Freelance Architect / Project Architect / Design Coordinator / Project Superintendent (Finishing) / Interim Head Housing Group / CaDD Operator [Prepares Architectural Body plans, Shop drawings, Keyplans, Coordinated Trade plans, Project CPM and Schedules, Estimates and a Specification Writer as stated below.
The following is a list describing various project assignments:
Home Office August, 1999 to Present
622 Dandan street
Tondo, Manila
Philippines 1012
Tel. No. +632 254-4962
[Freelance Architect][Prepares Architectural Design and Probable construction cost based on the clients requirements. Projects as follows :
§ [Mr. & Mrs. Reynaldo Santos] Residential renovation and expansion. Laguna Bel-Air, Sta Rosa, Laguna. 2 Storey, Design and estimate.
§ [Mr. & Mrs. Romeo De Castro] 3 Storey Residence. Corcuera Street Tondo, Manila. Project supervision / coordinator.
§ [Mr. & Mrs. Gery Gadia] 2 Stoey 4 Door Residential Apartment. Pamplona, Las Piņas, Manila. Design and estimate.
[Cadd Drafter][Prepares Architectural Design and Details based on the clients requirements.
§ [EEBLACK, LTD. MANILA][Prepares CaDD Details and Quantity take-off based on plans and details provided.
Project : Legislative Building Melekeok State, Republic of Palau.
DM Consunji, Inc. Main Office July, 1997 to August, 1999
2281 Chino Roces Avenue Ext.
Makati City, Philippines 1231
Tel. No. 841-0814
[Interim Head – Housing Group][Coordinate all matter related to all DMCI Housing Projects both on-going and for bids. Coordinate with respective project Architect’s and Consultants regarding Architectural Specifications.
DM Consunji, Inc. Main Office October 1996 to July, 1997
-Same-
[Estimator – Architectural][Estimates timely and accurate quantities for Architectural scope of works, prepares queries and quantity take-off worksheet for a various number of projects for bidding purposes.
BCDA CP-1 and CP-2 (Housing) September, 1995 to October, 1996
C-5 Road, Taguig, Manila, Philippines
[Project Superintendent – Finishing and Architectural scope of works][In charge of the total field operation. Including manning, equipment deployment and utilization, materials control / scheduling and coordinating with suppliers / subcontractors. Monitors and coordinate all the activities of the different trades and see to it that it conforms with agreed work sequence and work plan. Responsible in briefing and instructing Field Supervisors regarding contents of the plans, shop drawings, specifications and other special requirement needed for the success of the construction of the project. Presides over regular supervisory meetings, and implements standard quality control procedures, and the necessary safety and precautionary procedures within the jobsite.
ICC Telecoms August, 1995 to September, 1995
123 Roosevelt Avenue, Project 6,
Quezon City, Philippines
[Project Architect][Prepares the most economical formworks scheme for the project, prepares body plans coordinating structural details with the architectural, and prepares special details in such a way that it could be readily be understood at the field.
Ayala Pedestrianization Underpass March, 1995 to August, 1995
Ayala Ave. cor. Legazpi Streets,
Makati City, Philippines
[Project Architect / Superintendent / CaDD][Prepares the most economical formworks scheme for the project, prepares body plans coordinating structural details with the architectural, and prepares special details in such a way that it could be readily be understood at the field. In charge of the total field operation. Including manning, equipment deployment and utilization, materials control / scheduling and coordinating with suppliers / subcontractors. Monitors and coordinate all the activities of the different trades and see to it that it conforms with agreed work sequence and work plan. Responsible in briefing and instructing Field Supervisors regarding contents of the plans, shop drawings, specifications and other special requirement needed for the success of the construction of the project. Presides over regular supervisory meetings, and implements standard quality control procedures, and the necessary safety and precautionary procedures within the jobsite.
Ayala Triangle Project Phase-1 May, 1993 to March, 1995
Ayala Ave. cor. Paseo De Roxas Streets,
Makati City, Philippines
[CaDD Operator / Project Architect][Prepares the most economical formworks scheme for the project, prepares body plans coordinating structural details with the architectural, and prepares special details in such a way that it could be readily be understood at the field. Monitors and coordinates all the activities of the different trades and see to it that it conforms to the project schedule. Prepares plans, shop drawings, specification and other special requirements needed as instructed by the immediate supervisors.
DM Consunji, Inc. Main Office March, 1993 to May, 1993
-Same-
[CaDD Operator][ Prepares body plans for the following projects: Citibank Towers (Makati), Manila International Container Port (Port Area, Manila), Nissan Warehouse (Sta. Rosa, Laguna), and the Ayala Triangle Tower Phase –1 (Makati).