Posted by on October 14, 19101 at 14:23:39:
SAMARENDRA MUND
H No. 12-2-790-30 Email:mantumund@excite.com
Ayodhya Nagar Phone:+91-40-6564633(off)
Mehdipatnam +91-40-3515226(Res)
Hyderabad-500028
SUMMARY
To Design Cellular Network for maximum usage and better coverage at minimal use of Equipment and to Optimize it for better use of its resources.
Employment History
Employment Status:Employed(full time)
Total year of work Experince:Around 2 yrs.
Tools worked on:
RF Planning Tools: Wizard(Agilant Technologies),Map-Info Software
Network Planning Tools:OPNET(MIL-III Technologies)
Technical Skills:
Indepth knowledge in latest digital cellular systems like GSM,GPRS,CDMA & 3G and well familiar with the elements of cellular radio design.Strong knowledge in various technologies like ATM,SONET/SDH,DWDM,IP,OTDMA,OCDMA and XDSL.Speciliazation in Network planning ,modelling and simulation of High-speed communication Networks.Working Knowledge in Ericssion Stacks & Switch,RBS-1127 & CMS11 -RBS 1106.
Training’s Attended:
Trained in Network Planning/Modelling and Simulation using OPNET tool at Advanced Training Institute of Information Technology,Chennai.The Training was conducted by the team of professionals in India and academicians from IITs and IIsc and was specially trained in OPNET tools by the MIL3-Opnet Technologies.
In-House Training (Reliance Infocom Ltd)) on Wizard(Agilant Technologies) RF Prediction Tool.
In-House Training (Reliance Infocom Ltd) on SACFA/WPC Procedure.
Education:
Bachelor of Engineering(B.E)
Department of Electronics and Telecommunication
Specilization:Mobile Cellular Telecommunication
University of Mumbai,1999
Certification:
Post-Graduation Diploma in Communication Network Design.(GPA-78%)
(Advanced Training Institue of Information Technology,Chennai)
Working Knowledge:
Programmimg Languges: C & C++
Operating Environments:Win9x & Unix
Web Technologies:HTML
PROJECT DETAILS:
[Present Employment]
Employer :Reliance Infocom Ltd.
Industry :Basic Service Operator(WILL-CDMA)
Job Title :RF Engineer
Job Fucntion:RF,RF Planner(CDMA N/W in AP)
Date of Joining:December 2000 – Till Date.
Presently working with RELIANCE INFOCOM LTD as RF Planner in Hyderabad(Andhra-Pradesh,Southern India).The Job involves Cell site planning,evaluation,design and implementation of the latest state of art in CDMA wireless networks for the entire Andhra-Pradesh,Southern India.Planning involve City Survey,Site Location & Selection,Collection of input data for planning tool WIZARD with the use of GPS,MAP-GRID as well as TOPO Map Study etc.Analysis of Coverage prediction on Map-info & Planning tool.Check for all possible Interferences on air interface.In brief determining RF Coverage,Capacity, interface design and Link budget analysis.Generate lot of report using Map-info, Proper Utilization of the computer skills with Macro’s,Excel and MapInfo.Also Involved with cell site need determination,site search,evaluation and engineering cell site lease negotiation,Zoning,approval,site construction support,installation and commissioning of cell site equipment.In addition,resposible for SACFA/WPC related issues of the concerned project.
[Last Engagement]
Training :Advanced Training Institue of Information Technology(ATIIT)
Industry :High-End Training on Modelling/Simulation of Networks using
Sophisticated Networking Tool like OPNET.
Job Fuction:Modelling/Simulation of different projects using the same.
Date of Joining: June 2000 Date left:November 2000
Following are some of the projects.
Performance evaluation of IP-WDM under static and dynamic traffic(optical domain)
Abstract:With the use of modeling and simulation tools modelled and simulated the performance of IP-WDM under static and dynamic traffic.
Tools used: Modeler
Optimization of Interconnectivity of wired Network (star topology) and wireless Network(satellite communication) to build an ERP Network of ATM Mesh Backbone Using Opnet Tools
Abstract:The main aspect of the project was to build an enterprise resource planning network using OPNET tools which uses ATM complete mesh backbone topology.The backbone consists of six ATM switches each connected to a subnet.Each subnet has an interconnectivity of topologies as this project deals with interconnectivity of star and satellite communication.It was tested under combined form of load as data,voice,video(i.e convergence of information).The network was optimized to work under these conditions.
Tools used: Modeler
Building a Company’s intranet.
Abstract:The project was mainly to interconnect two floor of a Company using Star topology and to analyze the Statistics for a optimum network’s performance.The final deducing result was that there was not significant increase in the Ethernet delay on the network.While the server load was increased ,the overall delay of the network was not.
Tools used:IT –Decision-Guru
Modeling a Local-area-Network(LAN).
Abstract:The Project was mainly to model a Organisation’s Wan.The Organisation has offices in three different cities in India which are connected to the central network in the Capital of India.The offices were interconnected to each other by Phone lines and the aim was to determine how the background traffic was affecting the e-mail traffic on their network.
Tools used: IT-Decision –Guru
[Personal Particulars]:
Date of Birth:4th January 1977
Nationality:Indian
Gender:Male
Maritial Status:Single
Passport Number:BO366336