Posted by on August 10, 19101 at 02:49:56:
CURRICULUM VITAE
Name : IRFAN AHMED BAIG.
Nationality : PAKISTAN.
Date & Place of Birth : 16th DECEMBER 1964. RAWALPINDI
PAKISTAN.
Profession : HVAC ENGINEER.
Total Years of Experience : 10 Years (6 years design, 2 years installation,
2 years supervision)
Affiliation with : Registered Professional Engineer
Professional with Pakistan Engineering Council. (Life Member)
Institute : Member of Pakistan HVACR
Society; Affiliated with ASHRAE.
Address (Residence) : 29-E, Officers Colony, Wah Cantt, Pakistan.
Phone : Res: 92-0596-530542, (92-051-5580760)
E-mail irfanbaig36@hotmail.com,
irfanbaig36@yahoo.com
KEY QUALIFICATIONS
Practicing Professional Engineer since 1991.
1999 to Date
Assistant Manager
AERO, Pakistan
I am responsible to design, perform load calculations, HVAC equipment selection, air and water system designs (pipe & duct design), preparation of HVAC control and electrical distribution diagrams, tender drawings, estimation of bill of quantities & cost estimates, review of equipment submittals and shop drawings, supervise, test and balance, maintain and trouble shoot HVAC systems. I have directly dealt with all type of machines like Direct Fired Chillers, Reciprocating Chillers, Cooling Towers, Boilers, Heat Exchangers, Air Handling Units, Humidifiers, Fan Coil Units, Pumps, Fans, Split and Window ACs, etc. I have also supervised Building Management Systems.
1994 to 1999
Senior Engineer NESPAK,
Pakistan
I have been involved in HVAC system selection and design, load calculations, HVAC equipment selection, air and water system designs (pipe, duct design), preparation of HVAC control and electrical distribution diagrams, tender drawings in AutoCAD, project control and monitoring relevant to ISO 9001 standards, estimating bill of quantities, cost estimates and review of equipment submittals and shop drawings.
1992 to 1994
Site Supervisor
S. Mehboob & Co.,
Pakistan
I supervised HVAC installations works, coordinated with client and site, inspection of equipment and material, testing, balancing and commissioning of piping and ducting systems, scrutiny of bills and trouble shooting.
1991 to 1992
Application Engineer (HVAC)
HVAC Engineers,
Pakistan
I prepared tenders, estimates, submittals and supervised and executed HVAC works and managed site and home offices.
EDUCATION
Name of Institution : University of Engineering and Technology, Lahore, Pakistan.
Year of Passing : 1990.
Degree : B.Sc. Engineering (MECH), 1st Div.
COMPUTER PROFICIENCY
I have hand-on experience and full command over following computer software:
(a) CARRIER Load Calculation program (f) TACONET Pump, Expansion Tank, Heat
(b) Pipe and Duct Design Programs Exchanger selection program
(c) MS EXCEL, LOTUS (Spread Sheets) (g) AutoCAD (Drafting)
(d) MS PROJECT (h) MS WORD (Word Processing)
(e) CARRIER Psychrometrics program (i) MS ACCESS, DBASE (Database)
(j) CARRIER HAP (k) Life Cycle Cost Analysis
HVAC PROJECTS
a) Aiwan-e-Iqbal Complex, Lahore
Designed ventilation system for 270 car parking underground lot.
b) Simulator Building, Chashma
Designed a 250 TR HVAC system with BMS for this process simulation building.
c) State Life Insurance Corp. Office Building, Larkana (188 TR)
d) Clean Room Facilities, Hassanabdal
Clean rooms ranging from class 100,000 to 1000 were designed in number of buildings of this project. Special methods were adapted to control desired room airflows and pressures using VAVs incorporating BMS. Process/machine cooling and process air/fume systems were also designed.
FF Building (Cleanroom) 300 TR
N Building (Cleanroom) 200 TR
SIP Building (Cleanroom) 100 TR
Auditorium (500 Persons) 350 TR
Hospital (500 Bed) 800 TR
e) SGH-Specialty Center, Jeddah KSA
Oncology Cardio Thoracic and Neuro Surgery Hospital designed with VAV plus Reheat Coils air distribution with Cooling Load of 152 TR. I prepared all HVAC drawings on AutoCAD.
f) Saudi German Hospital at Abha, KSA (1600 TR) - Detailed review of HVAC design.
g) Bahawalpur Institute of Advanced Technologies, Bahawalpur (Phase-I : 4000 TR)
World's most advanced and largest residential university is being built in Pakistan with all the curriculum and extra curriculum facilities like admin. blocks, faculty buildings, applied sciences buildings, medical colleges, computer centers, libraries, gymnasiums, indoor and outdoor sports complexes, stadiums, cafeterias, banks, hostels, residential colonies, etc.
h) Kidney Center - Islamabad (250 TR)
A first in chain of Kidney Centers all over Pakistan, has all the facilities of a standard treatment of kidney & related ailments, indoor, outdoor, dialysis, operation theatres, ICUs, pathological department, services, etc. This project incorporates Direct Dual Fired Chiller-Heaters with AHU, Cooling Tower and ancillary equipment.
i) Kidney Centers - Hub & Karachi (200 TR Each)
Another two Centers with same zones are also designed at Hub and Karachi. These Kidney Centers have electrical reciprocating water chillers and there is no heating provision in winter as there is no requirement of winter heating in these areas.
j) Information & Cultural Complex at Rawalpindi (100 TR)
An auditorium with stage, orchestra, backstage, etc. with a seating capacity of 700 persons is designed with water-cooled packaged units.
k) State Bank of Pakistan, Rawalpindi
Supervised installation, balancing, testing and commissioning of a 360 TR capacity HVAC plant incorporating direct gas fired chiller-heater with ancillary equipment and system. Monitoring, bill verifications & scrutinies, equipment and material inspections, site coordinations, etc., were the major assignments.
l) Army Welfare Trust Plaza, Rawalpindi
Supervised installation of ductworks and coordination of reflected ceiling plans.