Posted by on March 09, 19103 at 16:21:12:
CURRICULUM VITAE
MUNEER AHAMED SHAIK
C/o S.A.FAZAL,
AT-9, Ramnagari,
Sutlaj Builders & Developers,
Ambegaon, Pune-44.
PH No: 9822310740 E-mail: muneerindia@ rediffmail.com
CAREER OBJECTIVE: Integrity of work and self-confidence, to seek a challenging career with zeal to work hard as team member in an organization.
EDUCATIONAL QUALIFICATION
¨ B.E. (Mech.) Passed in First division from “ Madurai kamaraj University “, Tamilnadu (1997-01).
¨ INTERMIDIATE Passed in First division (1995-97).
¨ S.S.C Passed in First division (1994-95).
TECHNICAL QUALIFICATION
Trained in Design, Erection & Maintaining H.V.A.C Systems from “TECHNOLCO INSTITUTE OF HVAC”, Hyderabad.
SOFTWARE SKILLS
§ HVAC Design : Elite.
Computer Aided Design : AutoCAD2000, Mechanical Desktop.
Project Maintenance : Primavera, Microsoft Project.
Programming : C-Language.
Packages : MS-Office.
Operating system : MS-Dos, MS-Windows ’95,’98.
ENGINEERING PROJECT
I have worked on a Project entitled ” Analysis, Erection and Design of Split Air Conditioning Systems ”. The project aims at the analysis, erection and design of split air conditioning system for a four-storied building and gives details of various considerations made while aiming at optimum design.
EXPERIENCE
Worked as Project Engineer in “SS COMFORT SYSTEM (P) Ltd.” Dealer of “Carrier Aircon (P) Ltd. ”, Hyderabad. For a period of one and half year from July 2001 to January 2002.
PROJECT PROFILES
Before joining the job, I get the full fledge knowledge of designing and work execution from a “ TECHNOLCO HVAC Training Institute”, and also learned AutoCAD 2000 from “AutoDesk Training Institute”. As a Project Engineer I have been deputed mainly for central plants only. I have done 3 central plants completely from starting to handling over the plant to the client.
PROJECT: 1
RANI RUDRAMMA DEVI AUDITORIUM
SITE ADRESS:
AP Police Academy,
HimayatSagar,
Hyderabad.
Project Engineer: Muneer Ahamed Shaik B.E
Machine used: Water Cooled Chiller.
Conditioned Space: Auditorium Building.
Area: 720 Sqmts.
Occupancy: 600 People.
Designed Tonnage: 90 TR.
Machine Tonnage: 99 TR.
EQUIPMENT DETAILS
CHILLER: 30HRC105 model of 99TR Water-cooled reciprocating chiller of CARRIER make is installed on one feet height concrete foundation. Dunlop Cushy Foots is used as anti vibrators.
CHILLED WATER PUMPS: Monoblock pumps of MATHER-PLAT, 3 nos are installed on one feet height concrete foundation. Foundation is positioned on rubber pads. Channel frames are grouted to the foundation on which pumps are positioned and held rigidly by nut and bolts. Each pump motor is of 7.5 H.P; they serve for the purpose of 135 gpm and 80 feet head. A header line connects three pumps of which one is a stand by. Rubber pads are used as anti vibrators.
CONDENSER WATER PUMPS: Monoblock pumps of MATHER-PLAT, 3 nos are installed on one feet height concrete foundation. Foundation is positioned on rubber pads. Channel frames are grouted to the foundation on which pumps are positioned and held rigidly by nut and bolts. Each pump motor is of 7.5 H.P; they serve for the purpose of 180 gpm and 100 feet head. A header line connects three pumps of which one is a stand by. Rubber pads are used as anti vibrators.
AIR HANDLING UNITS: Two air-handling units of 19,800-C.f.m and 65 mm static pressure of Boopathy (sitalclima) make are positioned on the concrete foundations as recommended by the manufacturer. Rubber pads are placed in between the foundation and air-handling units. It consists of forward curved DIDW centrifugal fan of NICOTRA make. Fan drive is provided by a TEFC, IP-55 insulated 15 H.P KIRLOSKAR motor.
COOLING TOWER: Two cooling towers of 50 TR cooling capacity (i.e. 180 gpm) are positioned on the terrace of the plant room. A header line connects two cooling towers.Cooling tower is made of FRP, consists of PVC fills, axial flow fan, TEFC, IP-55 insulated 3 H.P fan motor.
DUCTING: Duct is fabricated from G.I sheets and checked for the leaks.
PIPING: M.S pipe of “C-class” JINDAL make are used for chilled water piping, whereas G.I pipe is used for condenser water pipeline.
INSULATION: Main duct line is insulated acoustically with 25 mm thick rigid fiberglass, and branch duct lines are insulated thermally with 25 mm thick fiber glass wool. Thermocol sections insulate chilled water pipe line, cement plastering covering the sections.
PROJECT :2
GLOBAL TRUST BANK:
SITE ADRESS:
Global Trust Bank
Ashok Bhoopal Chambers,
Secunderabad,
Andhra Pradesh.
Project Engineer: Muneer Ahamed Shaik B.E
Machine used: Air Cooled Chiller.
Air-conditioned Space: Bank.
Area: 1680Sqmts.
Occupancy: 300 People.
Designed Tonnage: 160TR.
Machine Tonnage: 110 + 60 TR.
EQUIPMENT DETAILS
CHILLER: 30GTC110 & 30 GTC60 models Air-cooled reciprocating chiller of CARRIER make is installed on two feet height channel framed bed. Dunlop Cushy Foots is used as anti vibrators.
CHILLED WATER PUMPS: Monoblock pumps of KIRLOSKAR, 4 nos are installed on one feet height concrete foundation. Foundation is positioned on rubber pads. Channel frames are grouted to the foundation on which pumps are positioned and held rigidly by nut and bolts. Each pump motor is of 12.5 H.P; they serve for the purpose of 160 gpm and 50 mts head. A header line connects three pumps of which one is a stand by. Rubber pads are used as anti vibrators.
AIR HANDLING UNITS: Six air-handling units 11,000 C.f.m and 50 mm static pressure each of 39F550 model, CARRIER make are positioned on the concrete bed. Rubber pads are placed in between the foundation and air-handling units. It consists of forward curved, DIDW centrifugal fan of KRUGER make. TEFC, IP-55insulated, and 10 H.P KIRLOSKAR motor provide fan drive.
DUCTING: Duct is fabricated from G.I sheets and checked for the leaks.
PIPING: M.S pipe of “C-class” JINDAL make are used for chilled water pipeline.
INSULATION: Duct line is insulated acoustically with 25 mm thick rigid fiberglass, tissue paper and 18-gauge aluminum perforated sheet up to 10 feet, after 30feet duct is thermally insulated with 25 mm thick fiber glass wool with aluminum cladding over it. Thermocol sections of 25 mm thick insulate chilled water pipe line, followed by jute hessian cloth, 26 gauge G.I wire mesh and 15 mm thick cement plastering covering the sections.
PROJECT: 3
N.T.R TRUST BHAVAN:
SITE ADRESS:
T.D.P HEAD OFFICE
Jubilee Hills,
Hyderabad,
Andhra Pradesh.
Project Engineer: Muneer Ahamed Shaik B.E
Machine used: Air Cooled Chiller.
Air-conditioned Space: Nandamuri Hall.
Area: 520 Sqmts.
Occupancy: 200 People.
Designed Tonnage: 60TR.
Machine Tonnage: 60 TR.
EQUIPMENT DETAILS
CHILLER: 30GTC60 models Air-cooled reciprocating chiller of CARRIER make is installed on two feet height channel framed bed. Dunlop Cushy Foots is used as anti vibrators.
CHILLED WATER PUMPS: Monoblock pumps of MATHER-PLAT, 3 nos are installed on one feet height concrete foundation. Foundation is positioned on rubber pads. Channel frames are grouted to the foundation on which pumps are positioned and held rigidly by nut and bolts. Each pump motor is of 3 H.P; they serve for the purpose of 90 gpm and 21mts head. A header line connects three pumps of which one is a stand by. Rubber pads are used as anti vibrators.
AIR HANDLING UNITS: Two air-handling units 12,000 C.f.m and 40 mm static pressure 39F470 model of CARRIER make are positioned on the concrete bed. Rubber pads are placed in between the foundation and air-handling units. It consists of DIDW centrifugal fan of NICOTRA make. Fan drive is provided by a TEFC, IP-55 insulated 7.5 H.P KIRLOSKAR motor.
DUCTING: Duct is fabricated from G.I sheets and checked for the leaks.
PIPING: M.S pipe of “C-class” JINDAL make are used for chilled water pipeline.
INSULATION: Duct line is insulated acoustically with 25 mm thick rigid fiberglass, tissue paper and 18 gauge aluminum perforated sheet up to 10 feet, after 30feet duct is thermally insulated with 25 mm thick fiber glass wool with aluminum cladding over it. Thermocol sections of 25 mm thick insulate chilled water pipe line, followed by jute hessian cloth, 26 gauge G.I wire mesh and 15 mm thick cement plastering covering the sections.
PROJECT :4
CATALYTIC SOFTWARE
SITE ADRESS:
CATALYTIC SOFTWARE
Banjara Hills,
Hyderabad,
Andhra Pradesh.
Project Engineer: Muneer Ahamed Shaik B.E
Machine used: Split ductable.
Conditioned Space: Software development center.
Area: 135 Sqmts.
Occupancy: 25 People.
Designed Tonnage: 15 TR.
Machine Tonnage: 7.5TR-2 nos.
EQUIPMENT DETAILS
INDOOR UNIT: Two nos of Ductable Unit of CARRIER 40LC009 model of 7.5tr are positioned on angle frames, which are supported on the full threaded rods. Each unit consists of 2 nos direct driven forward curved DIDW centrifugal fan. There are 2 nos of permanent split capacitor type 0.5 H.P motors.
OUT DOOR UNITS: Two nos of out door units of CARRIER 38LH090T model of 7.5tr are positioned on 6inches height concrete blocks. Each unit consists of “hermetically sealed-reciprocating type compressor (NH2200BB) and 2 nos of permanent split capacitor type 0.5 H.P motors.
DUCTING: Duct is fabricated from G.I sheets and checked for the leaks.
INSULATION: Duct line is insulated acoustically with 25 mm thick rigid fiberglass, tissue paper and 18-gauge aluminum perforated sheet up to 10 feet, after 30feet duct is thermally insulated with 25 mm thick fiber glass wool with aluminum foil over it.
PROJECT EXECUTION & DOCUMENTATION
WORK EXECUTION:
1. Before starting a project all the drawing must be studied carefully and they must be crosschecked in the site.
2. By discussing with the sub contractor’s deadlines must be fixed for each and every work.
3. All indents must be prepared at a time and to be submitted in stores department required for the project.
4. To see that works to be finished with in the deadlines.
DOCUMENTATION:
Following are documents to be maintained:
1. Bill of quantities of the project and list of approved makes.
2. Project Execution Planed Report.
3. Daily field report - Register to be maintained in the site and record in coming and out going of workers and work done from time to time and note if any extra material required.
4. Daily expenditure report and expenses required for the every next week.
5. Maintain a register for materials coming to site and also for material used.
PERSONAL PROFILE:
NAME : Muneer Ahamed Shaik
Father’s Name : SK.Jaheeruddin
Date of Birth : 09-03-1980
Religion : Islam
Mother Tongue : Urdu
Languages Known : English, Telugu, Hindi & Tamil
Permanent Address : Muneer Ahamed Shaik
S/o SK.Jaheeruddin
Sharoff Bazar,Ponnur-5221214
Guntur (Dist)
Andhra Pradesh
India
Phone: 91-8643-242175
Present Address : MUNEER AHAMED SHAIK
C/o S.A.FAZAL,
AT-9, Ramnagari,
Sutlaj Builders & Developers,
Ambegaon, Pune-44.
PH No: 9822310740
Muneer Ahamed Shaik.
HVAC Engineer.
Application For : HVAC Project Engineer.