Posted by PRADEEP KUMAR on February 21, 19103 at 21:21:31:
CURRICULUM VITAE
NAME : PRADEEP KUMAR
PRESENT POSITION : DESIGNER(Piping/PDS)
NATIONALITY : Indian
DATE OF BIRTH : 5th. March 1974
MARITAL STATUS : Married
PASSPORT NO. : A-3734072.
DATE OF ISSUE : 17TH. September 1997.
VALIDITY : 16TH. . September 2007
PERMANENT ADRESS : RZ-226, Dharampura (I),
Najafgarh, New Delhi-110043
TEL.NO. (RES.) : 5024082.
E-MAIL : pkndalal@hotmail.com
QUALIFICATION : Two Years Certificate Course in Draughtsman ship (Mech.) from PUSA Industrial Traning Institute. N. Delhi.
COMPUTER LITERACY : Knowledge of PDMS,MDS & Plant Design System (PDS) – “Piping Modelling, Equipment Modelling, Drawing Manager, Isometric Extraction etc.”
- Auto cad Rel. 13 & 14,2000 .
- Microstation SE,
- Windows 95 & 98, MS Office 97 (MS Word, MS Excel, etc) and other utility programs
EXPERIENCE SUMMARY : Total of 7 1/2 Years experience in design and drafting of piping Drawings including more than Six years Computer Aided Drafting (Auto Cad Rel-12 & 13) in Chemical Plants, OIL & GAS Industries Viz. Refinery & Petrochemicals.
6 Years of the total experience in OFFSHORE design & drafting.
4 Years of the total experience in PDS
Overseas Deputation :
Deputed 3 Month for field engineering for FPSO P-33 &
P-35 at Shanhaigaun, CHINA.
SINCE SEPT.96 : TRIUNE PROJECTS PVT.LTD.NEW DELHI.
Triune Projects is an ISO-9001 Company engaged in hydrocarbon sectors viz Oil & Gas (Onshore and Off shore). Platforms, Refineries , Chemical & Petrochemicals Plants.
Responsibilities :
Preparation nozzle orientation, preparation of Equipment Layouts, Piping Studies, Piping GAD’ s Cad ding, Support GAD’ s, Index and Details, Isometric & Material Take off, Vendor Drawing. Review & Co-ordination with other Engg. Disciplines Etc.
CENTRAL PROCESSING PLATFORM NO-3 (CPP-3) in the area of BK-4 of WHITE TIGER oil field southern dome, Owned by Vietnam oil and gas corporation (Petro-Vietnam). production and storage platform.
Client- Keppel FELS, SINGAPORE.
Worked As designer in PDMS to CPP-3 Process top side Facility.
My responsibility are piping studies,prepration of skid drawings, Checking of isometric and commenting drawings
Of electrical, instrumentation, Civil for check interferance
With piping.
- Production Manifold
- Oil dehydrator
- Hydro-cyclone
- HP and LP Separators .
- Crude Heaters.
- Gas coolers
- Lift Gas Compressors.
- HP and LP Flare System
VEBA OEL (PSP) production and storage platform
(Neather and) with Hyundai Heavy Industries Co. Ltd. (Korea)
Worked As Draughts man to VEBA OEL (PSP) Process top side Facility on Micro station-SE
Job involves preparation of piping General Arrangement Drawings., Isometrics, Nozzle Orientation,
- Production Manifold
- HP and LP Separators .
- Crude Heaters.
- Gas coolers
- Lift Gas Compressors.
- HP and LP Flare System
(GIRASSOL) FPSO AND LOADING BUOY
Project for M/s. Hyundai Heavy Industries Company Limited, Korea
Job involved for missing lines routed in GADs and checking of piping GADs as per P&ID. Preparation isomatric and support marking etc. Job has drafted in microstation-SE.
(BHPP) BUFFALO FIELD DEVELOPMENT AUSTRALIA
- worked as a Draughts man on BUFFALO FIELD DEVELOPMENT FPSO PROCESS TOPSIDE FACILITY, AUSTRALIA for M/s. Schlumberger Singapore, Job involves development of Equipment layouts, Piping studies, Piping GAD s, Nozzle Orientation, Isometrics, support drawings and co-ordination with other Engg. disciplines. The described work has done for HP,MP,LP Separators, Produced Water Degasser ,Pumps, Hydro-cyclones, Heaters & Exchangers. Complete Job drafted in Auto-cad. R-13/R-14.
FPSO BRASOIL (BRAZIL) (Floating, Production, Storage & off-loading) Offshore Platforms-P33 & P35 Two Big Ships (VLCC) has been converted into FPSO of BRASOIL (BRAZIL) with Hyundai Heavy Industries Co. Ltd. (Korea)
- Production Manifold.
- Oil Dehydrators.
- Hydro-cyclones Units.
- Lift Gas Compressors.
- H.P. & L. P. Flare System
- Injection Water System
- Sea Water Lift System From Sea Chest To Fire Water System & utilities Etc.
- Oil offloading System.
DIGBOI REFINERY EXPANSION PROJECT :
Presently working as a designer for the above mentioned project.
Responsibility include 3D Modeling using Plant Design System (PDS) Software
BARAUNI REFINERY EXPANSION PROJECT :
Responsibility include 3D Modeling using Plant Design System (PDS) Software
MAY 95 TO FEB 96 : PETROTECH ENGINEERS (I) PVT. LTD.
Piping Draughts man
Responsibilities :
General arrangement drawing, Material take off, Plot Plant, Nozzle Orientation, Isometrics, Vessel Trim, Draft by Manually and Auto CAD Release-12.
Projects Handled :
Fimkassar Mini LPG Plant (Singapore)
Mathura Refinery Project (EIL)
Gas Authority of India Ltd. (LLDPE Plant)
Indian Oil Corporation Ltd. (FCC Unit Panipat Refinery)
Sewa Sajaa Layyag Gas Pipe Line (EIL)
SEPT. 93 TO MAY 95 : GLOBAL ENGINEERS
Draughts man (Mech./Piping)
Responsibilities :
Layout of Chemical Plant, Dairy Milk Plant, GA of Piping and Isometric, Pressure Vessels, Heat Exchange, Storage Tank and conveyor. Also will versed with manual drafting as well as computerised drafting and commercial package Auto CAD Rel.-12.
Reference- Mr. R. A. Sikka
Res. Tel. ---5511945
e-mail-------RASIKKA@ yahoo.com
(PRADEEP KUMAR))