Piping Supervisor

Piping Supervisor


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on January 17, 19103 at 06:25:33:

ILARDE R. AGUIRRE

Farmers Road Malaya, Telephone No. 674-4012
Pililla, Rizal 1910 Cellular No. 0917-248-4542
( Philippines ) E-Mail: ilardeaguirre@yahoo.com


PIPING SUPERVISOR / PIPING ENGINEER
AutoCAD 2000/AutoCAD Release 14
Microsoft Excel/ Word literate
BasicPrimavera Windows Set-up


EDUCATION : Far Eastern University - BS Mechanical Engineering

BRIEF SUMMARY OF WORK EXPERIENCE:


Over 16 years of combined experience in supervisions, engineering, overseeing, inspections and overseeing construction/expansion of Petrochemical and Petroleum refinery piping and rendering engineering drawing on AutoCAD base program, base on client standard

Two (2) years of overseas experience in the supervision of plumbing works ranging from first fix, second fix and final fixing activities to UPC standard (Uniform Plumbing Code).

WORK EXPERIENCES:

April 29, 2002 to Nov. 23, 2002 DICK AND DOOF CONTRACTORS N.V.
HF- Rapid Acid Dumping Project
P. O. Box 3999
Heintji kool z/n Curaçao
Netherlands Antilles

QC / PIPING INSPECTOR

NATURE OF WORK:

· Interpret plans, drawings, contract requirements, specifications and ensure safety regulations as required by the client (Isla Refinery).
· Monitoring daily/monthly progress prior to monthly progress report
· Coordinate, prepare inspection reports / request for inspection, such as structural alignment, equipment alignment and other types of inspection.
· Prepare test packages / weld mapping and encoding welding records
· Performs engineering drawing on isometric based on actual requirements.
· Performs dye penetrant examination and visual inspection of welding joints
· Coordinate with the supervisors in order to make advance information regarding revisions against the original contract plans.

Dec. 28, 2000 to April. 28, 2002 TECHNIP ITALY S.p.A
Isla Refinery Up-Grade Program
Emmastad Curaçao Netherlands Antilles
P. O. Box 4858

PIPING SUPERVISOR

NATURE OF WORK:

· Coordinate with subcontractor’s supervisors and subordinates in order to ensure good relationship, interaction among personnel.
· Supervision of the on-going Tie-in as required on the up-grading program of Isla Refinery.
· Coordinate with the subcontractor in order to make advance information regarding revisions against the original contract plans.
· Checking material take-off against the isometric.
· Supervision of the on-going erection of piping at Sulfur Recovery Unit.
· Performing engineering drawing revision on AutoCAD base program.
· Supervision of the on-going installation of piping at Sulfur Recovery Unit
· Initiate drawing revision as per the actual site condition using AutoCAD base program.

March 03, 1999 to July 03, 2000 JGC CORPORATION / MARUBENI CORPORATION
PARCO Mid-Country Refinery Project
P. O Box 71 Multan, PAKISTAN

PIPING SUPERVISOR

MECHANICAL SUPERVISOR

NATURE OF WORK / PIPING

· Coordinates with my subordinates to ensure proper sequence and implementation of work.
· Count actual daily manpower / equipment mobilized, check it base on the plan, and report the problem(s), to the Chief Piping Supervisor.
· Check piping work according to the execution procedure(s), and issue the instruction to subcontractors in order to rectify the defects of the works.
· Coordinate interfacial problem(s) including change order request/proposal affecting other work categories
· Prepare daily, weekly and monthly work reports and submit to the Chief Piping Supervisor.

CHECK BY SITE PATROL:

· Check color-coding or stencils for the pipes, fittings, valve and others based on the specifications.
· Check angle size of beveling portion by sampling inspection
· Inspect required outlet and inlet straight-line length of orifice flanges and prepare inspection reports of them.
· Check internal grinding surface of orifice flange and prepare internal report of them.
· Check correct wearing of badges as “ Qualified Welders.”
· Check welding point necessary for pre-heating instructed by the welding procedure specification.
· Check drying of welding rods.
· Check correct application of welding rods with the welding procedure specification.
· Check cleaning and removal of welding slug and spatter.
· Check layers and throat thickness at fillet welding in accordance with the related specification(s).
· Check of shop fabricated spool pieces and position and direction of branch pipes.
· Checks progresses of pipe rack, sleeper, and structure erection works at site, and report it to the Chief Piping Supervisor as necessary information for preparing piping work schedule.
· Check installation of temporary supports necessary for reducing stress to nozzles of equipment during piping work execution around the equipment, especially rotary machinery.
· Check correct use of brushes and grinding stone specified for stainless steel materials.
· Check correct installation of the globe valve, check valve, and "Y" type valves from the point of direction of flow in the line
· Check the item Number and correct installation of following parts from point of direction flow in the line. Item to include restriction orifice, "Y" type strainer, oval meter, steam trap, bucket type strainer, turbine meter, control valve, spectacle blind, breather valve, level instrument, level gauge, sample cooler, spring hanger, temperature instrument, orifice plate and safety relief valve.
· Prepare the test flow sheets for lines
· Check correct connection and installation of the lines and equipment base on the test flow sheets.
· Check the chlorine ion content, of test water as specified for stainless steel line(s).
· Checks welding of vent plug at the process, utility oil, or gas lines, in case of the line venting without valve.
· Check the cold set point of the spring hanger and removal of shipping lock pin and prepare the status list of it.
· Check removal of shipping lock pin for expansion joint, and prepare the status list of it.
· Check removal of temporary blind plates used for test and flushing and prepare the re-installation status reports.
· Check the installation of the restriction orifice.
· Check the situation as an open or close of the spectacle blind plate(s) in accordance with the pre-commissioning procedure.
· Check replacement of the permanent gasket by new one.


NATURE OF WORK / MECHANICAL


· In-charge in the inspection and execution of chemical cleaning of Net Gas Compressor Suction line as required by the specification.
· Monitoring of chemical analysis while the cleaning of the line was in progress.
· Direct in-charge in inspection execution of mechanically cleaned suction drum of compressor, drum to include crude column receiver gas knock-out drum, recycle compressor suction drum, net gas suction drum, re-contact drum #1, #2 and #3.
· Inspection of air fin coolers per the specified design requirement.


April 1998 to October 1998 Ras Laffan LNG Project under JGC/KELLOG
ABB Soimi S.p.A.
P.O. Box 8688 Ras Laffan
STATE OF QATAR


PIPING SUPERVISOR


NATURE OF WORK:

· Direct supervision of the on going installation of piping as per specification and it's standard piping support at the refrigerant storage and water treatment unit.
· Planning and scheduling of work as per the client priority schedule.
· Rendering partial drawing alteration as per the site actual condition.
· Checking isometric against P & I D to determine either the isometric components has been install as per the Piping and Instrumentation Diagram.
· Preparing test package punch list as per the commissioning priority schedule.

1997 to 1998 ARAMCO Rastanura Refinery Upgrade Project
Saudi Shin-Wha Company Limited under JGC
P.O. Box 431
KINGDOM OF SAUDI ARABIA


PIPING SUPERVISOR


NATURE OF WORK:

· Direct Supervision of the on-going installation of piping and support according to piping design and specification requirement on its quality wise safe.
· Responsible on the proper implementation / execution of work according to plans, design and specification.
· Monitor daily work accomplishment for proper guidance and support.
· Attend daily construction meeting and punch work item meeting.
· Informing engineering section on partial alteration / change of the drawing as per the site condition.
· Responsible in reviewing isometric drawing against P & I D.


1995 to 1997 Petrochemical Complex of Singapore (PCS II) JGC
Jurong Lube Base Project under TOYO ENGINEERING
Singapore Takada Private Limited
#51 Gul Road
SINGAPORE 629352


PIPING SUPERVISOR


NATURE OF WORK

· Area-wise segregation of isometric drawings, layout drawings and P & I. D. drawings.
· Perform engineering drawing revisions as per the instruction of the client (JGC).
· Rendering piping drawing revision as per condition on site.
· Overseeing the on-going installation of piping on subcontracted works base on plans and specification requirement quality wise and safe.
· Perform preliminary piping line check to determine the extent of the remaining works and piping material shortage.
· Confirmation of all piping balance as per the punch work item and specification.

September 2~November 2, 1994 Chandra-Asri Petrochemical Complex
Pt. Nisconi (TOYO ENGINEERING CORPORATION)
Cilegon' West Java,
INDONESIA

PIPING LINE CHECKER

NATURE OF WORK

· Perform piping line check as per the piping design and specification requirement.
· Confirmation of all the piping punch work as per the comment requirement.

November 21, 1992~August 15, 1994 Eleme Petrochemical Complex
CHIYODA NIGERIA LIMITED
Port Harcourt, Rivers State
NIGERIA

PIPING SUPERVISOR

NATURE OF WORK

· Estimating work volume for proper planning and scheduling of work, estimating material take-off and distribution of phase of work to each group/foreman.
· Direct supervision and handling in the fabrication of small bore and large bore piping allocated for pipe rack piping, around equipment piping, interconnecting piping and equipment piping of olefins and utilities and offsite area.
· Handling and supervision of the on-going piping installation and erection of piping works around spherical tanks of butane and propylene rich feed storage tanks.
· Supervision and handling of piping installation, alignment of 36" and 48" discharge and suction line of five units cooling water pumps.
· Attending and preparing weekly construction schedule quality wise and safe.

May 14, 1991~August 27, 1992 Al-Hugayet Trading and Contracting Establishment
Under ARABIAN OIL COMPANY
P. O. Box 530 Al-Khafji
KINGDOM OF SAUDI ARABIA

TECHNICAL FOREMAN

NATURE OF WORK

· Issuing all types of work permit and Perform gas test on sub-contracted hot works.
· Determining the presence of oxygen and gas like H 2 S as required on the confined space entry work permit.
· Draining gas freeing of Separators, Heat Exchangers and other related process line as required.
· In-charge on all the works of the areas in the plant. Work to include most on piping modification, changing of defective and corroded lines.

September 27, 1989~April 22, 1991 L.M.A. / under Philippine Petroleum Corporation
Malaya, Pililla, Rizal
PHILIPPINES

PIPING FOREMAN

NATURE OF WORK

· In-charge on all maintenance work, works to include performing maintenance job under hazardous condition such as line isolation on areas contaminated with toxic gas.
· Handling and preparation in the execution of hot tapping works (tie-in) as required in modification or revamp work.
· Direct in-charge in laying out pattern development of various kinds to include lateral branch and other type of support at the back of elbow and fabricating special elbow from 900 elbows and other related works.

March 5,1985~September 12, 1989 Jamjoom Wescon Company Limited
Petromine Shell Refinery Company
P. O. Box 10195 Al-Jubail
KINGDOM OF SAUDI ARABIA

PIPING SUPERVISOR

NATURE OF WORK

· Preparing daily hot and cold work permit as required on performing work on refinery operating area.
· Direct supervision of the on-going installation of piping for the New De-Bottle Necking Expansion Project
· Coordinate with Petromine Shell’s project supervisor regarding the piping location expansion project, project specification, project duration and safety procedure / practices inside the refineries.
· Supervision of related maintenance work, work to include hot tapping work, blinding and de-blinding of plant equipment as required on the preventive maintenance requirements.


July 10, 1981~July 18, 1983 Pre-Fabricated Building Company Limited
P. O. box 142 Al-Jubail
KINGDOM OF SAUDI ARABIA


PLUMBING FOREMAN

NATURE OF WORK

· Rough estimating of plumbing material take-off both on first fix, second fix and final fixing activities.
· Direct supervision in the installation of copper pipes and fittings as part of hot and cold water distribution system and the use of PVC pipes using rubber ring gasket as part of the drainage distribution system.
· In-charge of work scheduling both on first fix, second fix and final fixing activities to UPC standard (Uniform Plumbing Code)
· Coordinate with the Royal Commission and Bechtel related with the above commissioning requirement.

PERSONAL DATA


DATE OF BIRTH : January 19, 1958
PLACE OF BIRTH : Malaya, Pililla, Rizal
NATIONALITY : Filipino
STATUS : Legally Married
SEX : Male
HEIGHT : 1650 mm.
WEIGHT : 67 kg.
S. S. S. No. : 03-5705998-2
T. I. N : 116-000-155
LANGUAGE SPOKEN : Filipino / English / Spanish
PASSPORT No. : JJ 168849
DATE OF EXPIRATION : August 12, 2007 (Last entry point CURAÇAO NETHERLANDS ANTILLES)


_________________
Mr. Ilarde R. Aguirre
(Applicant)


[ Malaysia Online Resume Listing ] [ FAQ ]