hvac and plumbing supervisor

hvac and plumbing supervisor


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on November 20, 19102 at 17:19:02:


R E S U M E


Name Mohammad Farooq Malik Khan

Father’s Name Abdul Malik Khan

Address House # A-97 Block T
North Nazimabad Town
Karachi Pakistan

Permanent Residence: House # A-97 Block T
North Nazimabad Town
Karachi Pakistan

Nationality: Pakistani

Phone # 9221-6638880

E-mail fmkhan21@yahoo.com

Date Of Birth 27th November 1971

Marital Status Married


Professional Experience:

October 1998 to Present:


Mechanical Supervisor: The Aga Khan University Hospital

Responsibilities:

• Check and review the Design Development Drawings and Specifications from the consultants before the start of the project.
• After completion of Design Development stage of Drawings and Specifications prepare Purchase Request the Owner Furnished Material.
• Review the Quotations from the vendors for finalizing the equipment.
• Monitor the HVAC, BMS and Plumbing works at site as per specifications and good engineering practice and as per University’s quality standard.
• Commission the HVAC, BMS and Plumbing system and hand over to maintenance department.

Major Projects:

1. THE SPORTS AND REHABILITATION CENTRE:

CAPACTIY 140 TR.
Installation, Operation & Commissioning of Air handling Units, Ventilation and Exhaust Fans, Chilled Water, Hot Water & Submersible pumps and BMS systems.


2. OFFICES IN CHS VERANDAH:

CAPACTIY 40 TR.
Installation, Operation & Commissioning of Air handling Units, Ventilation and Exhaust Fans & BMS systems.

3. NAZERALI-WALJI AMBULATORY CARE BUILDING:

CAPACITY 100 TR.
Installation, Operation & Commissioning of Air handling Units, Exhaust Fans, Chilled Water, Hot Water & Submersible pumps and BMS systems.

4. KHIMJI BUILDING FOR CARDIAC SERVICES:

CAPACITY 120 TR.
Installation, Operation & Commissioning of Air handling Units, Exhaust Fans, Chilled Water, Hot Water & Submersible pumps and BMS systems.

July 1996 to September 1998:


Junior Engineer: Greaves Cotton Air-conditioning Pvt. Ltd.

Responsibilities:

• Tender bidding of HVAC & Plumbing system.
• Prepare schedule of works with Co-ordination with other services.
• Prepare shop drawings with the Co-ordination with other services.
• Plan the works on site as per schedule and owner requirements.
• Mark changes of record drawings.
• Make sure that works should be commenced as per schedule.
• Commission the whole system by getting witness of consultant.
• Prepare As-built drawings.
• Hand over the whole system after successful completion.


Major Projects:

1.OVERSEAS INVESTORS & CHAMBERS BUILDING:

CAPACITY 65 TR.
Installation, Operation & Commissioning of Chiller, Air handling Units, Chilled Water pumps.

2. PAKISTAN CABLES PVT LTD:

CAPACITY 45 TR.
Installation, Operation & Commissioning of Chiller, Air handling Units, Chilled Water pumps.

3. HEAD OFFICE BUILSING OF SUI SOUTHREN GAS COMPANY:

CAPACITY 900 TR.
Installation, Operation & Commissioning of ductwork & VAV boxes.


April 1994 to June 1996


Site Engineer: Mehran Air-conditioning Services Pvt. Ltd

Responsibilities:

• Tender bidding of HVAC & Plumbing system.
• Prepare schedule of works with Co.-ordination with other services.
• Prepare shop drawings with the Co.-ordination with other services.
• Plan the works on site as per schedule and owner requirements.
• Mark changes of record drawings.
• Make sure that works should be commenced as per schedule.
• Commission the whole system by getting witness of consultant.
• Prepare As-built drawings.
• Hand over the whole system after successful completion.

Major Projects:

1. MARRIOT HOTEL KARACHI:

CAPACITY 40 TR.
Installation, Operation & Commissioning of Fan Coil Units at Health Center with ductwork, Installation, Operation & Commissioning of Fire Sprinklers.


2. PEARL CONTINENTAL HOTEL KARACHI:

CAPACITY 360 TR.
Installation, Operation & Commissioning of Chilled water pumps with chilled water and condenser water piping.

3. PEARL CONTINENTAL HOTEL PESHAWER:

CAPACITY 360 TR.
Installation, Operation & Commissioning of Fan Coil Units & Chilled water pumps with chilled water and condenser water piping and ductwork.

4. HEAD OFFICE BUILDING OF NATIONAL BANK:

CAPACITY 100 TR.
Installation of ductwork on various floors.


Feb 1992 to March 1994


Assistant Engineer: A.Saadat & Co. Consulting Engineers

Responsibilities:

• Prepare design parameters for HVAC and Plumbing systems.
• Study the Architectural drawings as per HVAC and Plumbing requirement.
• Discuss with seniors to make a strategy of designing the system.
• Prepare design drawing after co.-ordination with Architects.
• Prepare specifications and Bill of Quantities of the job.
• Call the bids and open the bids as per Owner’s requirement.
• After finalizing the contractor check the shop drawings and make necessary remarks and comments where required to fulfill the requirement of the specifications.
• Issue necessary revision of drawings when required for smooth work at site.
• Check the submittals of contractor and give comments/approval.
• Check the installation of all works at site.
• Check & Verify the commissioning of all HVAC and Plumbing equipment at site.
• Check the As-built drawings and give comments/approval.

Major Projects:

1. AGA KHAN UNIVERSITY & HOSPITAL:

Designing of various HVAC and Plumbing Projects.

2. AGA KHAN HOUSING BOARD:

Designing of Plumbing Town planning.

Education and skills:

• Diploma of Associate Engineer in Mechanical Engineering 1990-91 from Jinnah Polytechnic Institute Karachi.

• Knowledge of Microsoft word and Microsoft excel and excellent command of English.


References:

1. Mr.Anwar Saadat.

A.Saadat & Co. Consulting Engineers.

Address: 3rd Floor Hamid chambers Zaibunisa street Karachi-74400 Pakistan
Tel: 5670444, 5670439
Fax: 5670448
Email: ascohvac@khi.compol.com


2. Mr. Farooq Mehboob.

S.Mehboob & Co. Consulting Engineers.

Address: Suite # 4, 4th Floor Dean Arcade block 8 Clifton Karachi-75600 Pakistan.
Tel: 5874571, 5870515
Fax: 5861928
Email: smehboob@cyber.net.pk
Web: www.smehboob.com


3. Mr.Zafar Abbasi.

A.R Associates. Consulting Engineers.

Address: Suite # 314, 3rd Floor Mashriq Center Sir Shah Suleman road Gulshan-e-Iqbal Karachi
Tel: 4852589
Fax: 4941059


4. Syed Akhlaque Hussain.

Greaves Cotton Air conditioning Private Ltd.

Address: 2nd Floor Modern Motors Building, Beaument Road P.O Box # 4908 Karachi-75530 Pakistan.
Tel: 5682565-67, 5682569-70, 5683111
Fax: 5682839, 5683425
Email 1: ahgca@khi.fascom.com

Email 2: greaves@super.net.pk
5. Construction Department Aga Khan University Hospital Stadium road P.O Box # 3500 Karachi-74800 Pakistan


5a. Syed Shahab Akhtar. Manager Projects.
Tel: 4859-2780
Fax: 4934294, 4932095
Email: shahab.akhtar@aku.edu

5b. Mr.Masood Jafri. Manager Projects.
Tel: 4859-2770
Fax: 4934294, 4932095
Email: massod.jafri@aku.edu

5c. Mr.Mir Fateh Sultan. Chief Mechanical Engineer.
Tel: 4859-2775
Fax: 4934294, 4932095
Email: mir.sultan@aku.edu

5d. Mr.Ikhtiar Ahmad Khan. Chief Electrical Engineer.
Tel: 4859-2774
Fax: 4934294, 4932095
Email: ikhtiar.khan@aku.edu

5e. Mr. Rashid Hussain. Mechanical Engineer.
Tel: 4859-2776
Fax: 4934294, 4932095
Email: rashid.hussain@aku.edu


6. Abdul Malik Khan.

Imperial Air conditioning Co.

Address: B/3 Lacewala building Sultan Ahmad Shah road, Union commercial Area, 7/8 Karachi Pakistan.
Tel: 4530041
Fax: 4530041


7. Mr.Abbas Sajib / Mr.Mehmood Ahmad.

Engineering Services

Address: Suite # 7, 3rd Floor # 680-681/C Allama Iqbal road P.E.C.H.S. Karachi-75400 Pakistan.
Tel: 4546583-84, 4542691
Fax: 4546584
Email: enggser_pak@hotmail.com


8. Mr.Abdul Hameed.

National Engineering Services.

Address: 304, Industrial Auto part building Marston road Karachi-74400 Pakistan.
Tel: 77225522, 7733321
Fax: 7761946
Email: nesoffice@yahoo.com


9. Mr.Tajammul Husayn.

Season Master Engineering.
Address: 402, Amber Estate Extension A-32 K.C.H.S. off Sharae Faisal Karachi Pakistan.
Tel: 4528161-62
Fax: 4548828




[ Malaysia Online Resume Listing ] [ FAQ ]