Electrical Engineering,Formen/Supervissor/Eng.Technician

Electrical Engineering,Formen/Supervissor/Eng.Technician


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on July 10, 19102 at 23:37:55:

M.Shuaib Hussain
Royal Commission (power,desalination & Sea Water cooling Dept.)
P.O.Box. 30618,
Yanbu Al-Sinaiyah,
Kingdom of Saudi Arabia.
Tel. Office 966 4 3966266
Residence 966 4 3211803
Fax. Office 966 4 3961735
E mail shuaibynb@hotmail.com
-------------------------------

City & Guilds Full Technological certificate-London.,15years experience as a Electrical Formen/Supervissor in Power & Desalination plant in Yanbu Al Sinaiyah-KSA.Power Plant Capasity:-4x127MW Steam turbine Generators(Mitsubishi)+ 8 x 70MW Gas Turbine Generators (Hitachi)+ 1 x 90MW General Electric gas Turrbine Generators with Digital Exitation controls (EX 2000).

Also Responsibilty of maintenance 6x3500Kw & 4x1750KW syn. motors in the sea water pump house.
Voltage levels;
13.8Kv@ Generators
4.16 Kv@ Syn. & Induction motors
480v Inductin motors.

Troubleshooting ability of Generator Ex. circuits,Tr.Bridge over head cranes, Invertors (10x40kvainvertors-Mfr. by SCI,FUGI,SAFT,ANSALDO...)
bATERY CHARGERS, sTATIONERY BATTERIES lead acid & Ni Cd UP TO 4000Ah,Lighting systems(Street lights,90Meter smoke stack-chimeny strobe lights & red becons),Trouble shooting of Switch gears & breakers/control circuits with two incomers with a bus tie system13.8kv,4.16kv & 480kv Air blast breakers, sf6, Air cct breakers, Vacum cct breakers.


[ Malaysia Online Resume Listing ] [ FAQ ]