Posted by on April 29, 19102 at 23:53:59:
INFORMATION
NAME : REJI BABY
NATIONALITY : INDIAN
DATE OF BIRTH : 28.04.1976
QUALIFICATION : DIPLOMA IN MECHANICAL ENGINEERING
DIPLOMA IN AutoCAD
SEX : MALE
RELIGION : CHRISTIAN
ADDRESS : No.167, East Balaji Nagar,
Kallikuppam, Ambattur, Chennai-600053.
Tamil Nadu, India
Ph.Res:044-6581915
Cell Ph: 9841149110
WORK EXPERIENCE
1.OVERVIEW
An experience totaling 5 years out of which 4 years in a Government run oil refinery in the field of Piping design, Structural design, Materials department and in Maintenance and the rest one year out of which 4 months as design engineer in the design of all kinds of hydraulic and pneumatic cylinders and the rest 8 months as Supervisor engaged in inspection and designing of boilers, vessels and soot blowers.
2.EXPERIENCE
“July 1998 To Till Date
M/s Chennai Petroleum Corporation Limited, Chennai, India
Refinery Technician / Draftsman”
“February 1998 To June 1998
M/s Sea Hydropower (India) Pvt. Limited, Chennai, India
Design Engineer”
“June 1997 To January 1998
M/s R.R.Techno Mechanicals Private Limited, Chennai, India
Supervisor”
3.COMPANY’S PROFILE
M/s Chennai Petroleum Corporation Limited, an ISO 9001, ISO 14001 and OSHAS 18001 is a company undertaken by the Government of India and involved in the refining of Petroleum and Petroleum products and marketing of the same for the past 30 years. The company has a refining capacity of 10.5 MMTPA and has a taken up a project involving an expansion of additional 3MMTPA.
I joined M/s Chennai Petroleum Corporation Limited during the year 1998 as a trainee for one year in the field of Maintenance and Power Plant Operation and then joined into company’s service as Refinery technician in the Materials department for a year and then as draftsman in the
Piping, Structural and Civil Design. As draftsman I have involved in a Project for the design of
Lube loading facility at our refinery which is a project estimated at Rs.35 Crores.
4.RESPONSIBILITIES
1. M/s Chennai Petroleum Corporation Limited
a) Job profile includes designing piping line drawings based on ASME / ANSI / API / IS and
CHT Standards.
b) Mechanical Structural drawing based on IS Standards.
c) Civil drawings based on EIL / IS Standards.
d) Preparation of Plot Plans / Layouts for Refinery units.
e) Preparation of P&IDs, PFDs for various units.
f) Preparation of Fire water network piping for Refinery plants and Storage tanks.
g) Preparation of Power Plant Piping.
h) Preparation of General Arrangement and Piping drawings for Exchangers as per TEMA
Standards.
i) Preparation of General Arrangement and Piping drawings for Pumps / Compressors as per
Standards.
j) Preparation of Isometric Piping drawings for various units.
k) Under Ground Piping drawings for plants.
l) Preparation of Plant modification drawings based on site analysis.
AREAS OF EXPOSURE:
PIPING:
1. Preparation of Plot Plan, Layouts and Piping Plan for Various Refinery Units which includes,
i) Crude Distillation Unit which includes
Atmospheric Distillation Unit
Vacuum Distillation Unit
ii) Fluidised Catalyst Cracking Unit
iii) Hydrogen Unit
iv) Lube Unit
v) Wax Unit
vi) Sulphur Recovery Unit
vii) Diesel Hydro Desulphuriser Unit
viii) Lube Unit.
2. Preparation of Modification Piping drawings for Power plants
i) 4nos x 85 tons/hr Steam Production
ii) 3nos x 130 tons/hr Steam Production
iii) Gas turbine Plants 2nos x 20 tons/hr.
3. Preparation of Isometric drawings for specified lines, Under Ground Routing of lines and
Routing of lines over pipe racks at various elevations.
5. Preparation of Fire water network in refinery and around
STRUCTURAL:
1. Design of TRESTLE for Pipe Supports.
2. Design of Structural Platforms for Columns / Vessels / Exchangers / Pipe Bridges etc.
3. Design of Pipe racks, Roof Truss,
CIVIL:
1. Design of foundations for Structures / Pumps / Exchangers / Vessels / Column etc.
2. Design of Pile layout and Pile cap.
3. Design of Culverts
4. Design of R.C.C Pavements
JOB PROFILE:
1. Exposure to an inventory of Rs.500 Crores.
2. Receipt and Isssue of Materials
3. Annual Physical Stock verification.
4. Monthly Reconciliation of Physical Stock with respect to the Ledger Stock and Finance Stock.
5. Preparation of monthly stores ledger and annual Stock ledger.
6. Computer Posting and Updation of issues and Receipts.
6. Preparation of Annual Stock report
a) Field : Maintenance (Six Months)
Exposure : Heat Exchangers, Storage Tanks, All Kinds of Valves,
IC Engines, Cranes, Cooling Towers, Thermal Power Plant,
Water Treatment Plant, Rotary Equipments.
b) Field : Power Plant-Operator Trainee (Six Months)
Exposure : THERMAL POWER PLANT
85 tons/hr Steam generation - 4 Boilers
130 tons/hr Steam generation - 3 Boilers
4x40 MW Power generators
3x55 MW Power generators
2x20 MW Power generators
GAS TURBINE PLANT
2x20 MW Power generators
TERTIARY TREATMENT PLANT
Reverse Osmosis Process.
DE-MINERALIZED WATER TREATMENT PLANT
AUXILIARIES
Reciprocating Compressors, Rotary Pumps, Air Drier System,
Furnace Oil distribution System, Fuel Gas distribution system,
Condensate Recovery system through De-oiler, Heat Exchangers,
Vapouriser, Laboratory Analysis of DM water and Condensates.
2. . M/s Sea Hydropower India (P) Limited, Chennai - (Feb 1998 to June 1999)
An ISO 9001 company as Design Engineer.
JOB PROFILE:
a) Design of all kinds of Hydraulic Cylinders, Hydraulic Jacks, Power Packs etc.
b) Design of fabrication drawing of hydraulic cylinders on AutoCAD Platform.
3. M/s R.R.Techno Mechanicals (P) Limited, Chennai - (June 1997 to Feb 1998)
As Supervisor.
JOB PROFILE:
a) Looked up the design of Soot blowers, De-aerators, Elevators, lance tubes, Steam nozzles
b) Stage and Final inspection of in-house built components.
c) Vendor development.
d) Trouble shooting in the working of Soot Blowers.
e) Pressure testing of IBR certified valves.
f) Final assembly of components proving to customer requirements and satisfaction.
ADDITIONAL INFORMATION
1. Underwent training on Implementation of Enterprise Resource Planning (ERP)
2. Underwent training on ISO 9001
3. Underwent training on ISO 14001
4. Underwent training on Occupational Health Hazards
5. Underwent training on Productivity tools (AutoCAD)
6. Underwent training on the conversion of Raster to Vector images
7. Underwent training on EDMS (Electronic Data Management System)
SOFTWARE EXPOSURE
1. Passed Diploma in AutoCAD R-14, R-2000
2. Exposure to GCAD
3. Knowledge of MS WORD, MS OFFICE
4. Knowledge of MS POWERPOINT
5. Knowledge of Link Master (EDMS – Client Package)
LANGUAGES KNOWN
English, Hindi, Malayalam, Tamil and Telugu