Instrumentation & DCS Engineer

Instrumentation & DCS Engineer


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on October 12, 19101 at 11:28:51:

PERSONNEL DETAILS
Name : Ashish Vijaywargiya
Permanent Address :Bld No 73/A, Sector 6, RPL Township
Present Location : Jamnagar - Gujarat
Reliance Petroleum Ltd, Jamnagar –361 140
Country : India
Date of Birth & Years : 13.05.1972 , 29 Years
Passport No : A0776629 Expiry Date : 20.02.2007
Marital Status : married
E Mail :ashish_vijaywargiya@rediffmail.com
Ph No : 0288-298837
EDUCATIONAL QUALIFICATIONS
Education
Higher Sec School ( Class XII) Ist Class (Distinction) – 81% 1988
BE - Electronics Ist Class (Distinction)– 77.5% 1992
EXPERIENCE & SPECIAL SKILLS
SPECIAL SKILLS : C++ , UNIX , Window98, Window NT, Oracle , MS-DOS Hummingbird Exceed (X-terminal emulation software),
Personal Strengths: Time management skills, Dependable, Energetic, Creative and resourceful, Sense of responsibility.
OBJECTIVE : To be involved in the field of Project,Advance Process control, DCS and Instrumentation field.To achieve leadership through technical excellence.
Accomplishment :
Associated with Foxboro for 4 months for system Engineering of DCS/TAS at their work Chennai.
Associated with Foxboro for Triconics make Tripple modular Emergency shutdown system engineering
Attended Software and system Maintenance training in DCS/TAS
Attended FAT for TAS/DCS/ESD at Foxboro works Chennai
Attended Sun Solaris training by Wipro
Attended a certified course (duration 3 months) on Unix, C++ by NIIT
Attended a certified course on ISO by LRQA, Mumbai
Attended training on Allen Bradley PLC, Rosemount DCS RS3

AWARDS :Received National Merit scholarship for the period 1988 to 1992 during degree course.
Received special award for performance in Reliance Petroleum LTD for the year 1999 & 2000.
Promoted as a Dy. Manager Instrumentation from Assistant Manager in 2001

Relevant Exp. For the post applied - 8.5 years

A) Reliance Petroleum ltd, Jamnagar : World largest single stream grassroots refinery with a Capacity of 35MTPA. This plant is of ‘State of the art’ and one of the worlds highly automated Refineries.
Position:Dy. Manager
Specialization : Control & Instrumentation
Date Joined : 20.12.1997
Project activity
1.Evaluation of Technical specification.
2.Preparation of different system database for DCS, Emergency shutdown system, third party system interface, Functional design spec. of Terminal Automation System.
3.Preparation of operating philosophy, scope/logic's design documents for Terminal automation system, Oil movement and information system and different DCS interlock.
4.Inspection of Instruments at our site as well as at vendor works.
5.Erection / Installation of Instruments and panels.
6.The responsibility includes involvement in Development, erection, Commissioning and maintenance of different modern and complex instrument systems for handling India's most sophisticated Terminal Automation System, Foxboro IA series DCS, ESD, CTM, ATG.

A) Terminal Automation System (TAS) : Its India’s first fully automated Gantry automation system.
1.Involved in Design , freezing of function design specifications, approval of documents.
2.Involved in System configuration, FAT at Foxboro Chennai, erection, commissioning of TAS.TAS software has a layer that interfaces core modules with the following major systems
The SAP interface software to the SAP system on the Business Server.
The Weighbridge supplied by M/s Sanmar.Large Panel Display Boards.
Access control Devices supplied by Contrec Australia Tank Information System(TIS)
Oil Movement and Information System (OMIS ) Foxboro IA series DCS ,
Batch controller Unit supplied by Contrec Australia ,
Different Client PC connected through Exceed Software on TCP/IP

B) Foxboro IA series DCS
1.Involve in Design, development, and system configuration of DCS. Its include Graphics buildup, system configuration, Historian, Alarm, trend configuration etc
2.Involve in System configuration for various third party serial link interface with Rotork Motor operator valves, Intelligent MCC by L&T, Automatic tank gauging system by SAAB, Custody transfer meter by FMC Smith, Batch Controller unit by Contrec, Australia, ESD by Triconix.
3.Involve in erection, commissioning of DCS, system administrator aspects.
4.Real Time integration of DCS with GAIL pumps station control
5.State of Art Alarm management Software for history, archiving, frequent analysis for clients anywhere in Reliance Group
6.A beta site – Development site – test bed for latest linking software to other DCS systems or Real time network.
7.Interface of DCS with different dosing packages

C) Advance Process Software’s such as
1. Tank farm inventory system (TIS) configuration.
2. System configuration in G2 based Oil movement and information system.
3. Info plus 21 software for integration with IT network for management information.

D) Other Systems
1.Involve in database preparation, FAT, erection, commissioning of tripple module redundant ESD system.
2.Erection, commissioning and interface of modern instrumentation likeMotor Operated Valve by Rotork,Automatic Tank gauging system by SAAB,Custody Transfer metering system by FMC Smith,Foxcom Protocol Transmitters, PEEK make Densitometer,Flow instrument like Mass Flow meter (Elite model) by Fisher Rosemount, Turbine meter by Hoffer, Smith Control Valve by M/s Neles,Keystone,Fisher.Digital Set Stop valve by Daniel, FMCBatch Controller Unit by Contrec Australia,Fire & Gas instrument - Wormold

E) Present Job Activity
1.Development of TAS expansion for the new products as per marketing /Operational requirement
2.Tank farm Expansion Project for the new tankage facility, its include expansion of all the systems.
3.Operation, maintenance and system Administrative activity of TAS/DCS/ESD
4.Commissioning activity of Rail loading automation for LPG and liquid product
5.Steady state Plant Maintenance with SAP-R3 system, it includes
Daily maintenance through SAP Notification system.Preventive maintenance as per SAP scheduleOrdering of spare through SAP
Calibration and other Inst. Records in SAP
6.Involve in ISO 9001-2001 procedure and documentation (instrument aspects) for RPL Jamnagar.

B). Indian Rayon & Ind. LTD, Veraval : An Aditya Birla Group of Company in the field of viscose filament based Rayon Plant, Caustics Soda Plant, Coal fired Power Plant
Position:GET & Dy .
EngineerSpecialization : Control & Instrumentation
Date Joined:04 June 1993
Date left:13 Dec 1997

Responsibility handed: Work as a Sectional Inst.Head for Project/Commissioning activity of Caustic Soda Project.
1.Project activity of erection, commissioning, maintenance of 100TPD membrane based Caustic Soda Project.
2.Rosemount RS 3 DCSComparative study of different vendor offers, Detail Engineering of Rosemount DCS - RS
3 system Factory acceptance test at vendor works.Commissioning of DCS.Training in system configuration and hardware maintenance of DCS.
4.Detail Engineering, system configuration in Allen Bradley PLC 5/254.
Experience in calibration, Installation and maintenance of different Instruments.
5.Front leader in ISO 9002 document preparation and other activity.

I hereby declare that the above information given by me is true and best of my knowledge.

ASHISH VIJAYWARGIYA


[ Malaysia Online Resume Listing ] [ FAQ ]