pdms designer

pdms designer


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on June 06, 19101 at 04:08:49:

Shreedhar Pandurang Parab

Objective :

Seeking a responsible and rewarding position in a dynamic environment to further the growth of the organization where I can build on my experience and learn new things every day utilizing my technical & computer background.

Profile :

Passed S.S.C. in March 1992 from Bombay Board with First Class & Mechanical Draughtsman course from I.T.E.I. in March 1994 with First Class. Also done Diploma in Autocad - I & II on R-14 from K. J. Somaiya Institute of Technical Training & Research.

Computer Skills :

Operating System : Dos, Ms-Windows 95, Windows NT
Applications : Ms-Office (Word, Excel, etc.), Autocad Release 14 including Auto Lisp Programming, & PDMS (Using modules Design, Isodraft, Draft etc.)

Experience (Total 5 1/2 Yrs.) :

1) Currently working as a PDMS Designer with M/s. R. J. Associates since March ‘01.

Projects : Sumitomo Chemicals

Job Responsibility : Piping modeling & Extraction of isometrics.

2) Worked with M/s. Kvaerner Power Gas (I) Ltd. as a PDMS Designer from Sept. 2000 to Feb. ‘01

Projects : Conoco & Dow Chemicals co. Ltd.

Job Responsibility : Modeling of piping, supports & Extraction of isometrics

3) Worked as a Piping Design Draughtsman with M/s. Dalal Consultants And Engineers Ltd. (Thane) from Dec. ’99 to Aug. ‘00

Projects : Hindustan Petroleum Corpn. Ltd. - LPG Bottling Plants.

Job Responsibility : Preparation of Piping study layout, Yard Piping Layouts, Piping Sprinkler Layouts, Hydrant Layouts, Support Details, Piping Sections & Details etc.

4) Worked with M/s. R. J. Associates Engg. Pvt. Ltd. through M/s. Parab Consultancy Services as a Design Draughtsman from June ‘98 to May ’99.

Projects : Hindustan Petroleum Corpn. Ltd. - DHDS Project, Huldia Refinery Ltd. - DHDS Project.

Job Responsibility : Preparation of Piping G.A., Piping Isometric, Equipment Layout, Support Details, Nozzle Orientation, Bulk & Final MTO, etc.
5) Worked with M/s. Kvaerner Power Gas (I) Ltd. through M/s. Tushar Engineers as a Piping Draughtsman from Jan. ‘98 to May ‘98.

Projects : Coachin Refinery Ltd.

Job Responsibility : Preparation of Piping study layouts, IBR isometrics, Nozzle Orientation, Piping Sections, etc.

6) Worked with M/s. R. J. Associates Engg. Pvt. Ltd. through M/s. Parab Consultancy Services as a Design Draughtsman from Sept ‘95 to Dec. ‘97.

Projects : Sumitomo Chemicals Co. Pvt. Ltd. &Camphor and Allied Products. Ltd.

Job Responsibility : Preparation of Piping G.A., Piping Isometric, Equipment Layout, Support Details, Nozzle Orientation, Bulk & Final MTO, etc.

7) Worked with M/s. Chemtex Engineers (I) Ltd. through M/s. Satguru Enterprises as a Piping Draughtsman from Sept. ‘94 to Aug ‘95.

Projects : Pet Resin Plant - Pallanza.

Job Responsibility : Preparation of Piping G.A., Piping Isometric, Support Details, Piping Sections, Final M.T.O., As-built drgs., etc.


Personal Details :

Nationality : Indian

Date of Birth : 7th February 1977.

Sex : Male

Permanent Address : J-1/4, S. G. Barve Nagar,Ghatkopar (W),Mumbai - 400 084.

E-mail address : shreedhar_parab@rediffmail.com

Phone No. : 512 01 02

Passport No. : A 6179672 valid upto 2008

Languages Known : English, Marathi & Hindi


References will be furnished as and when required.

I hereby certify that the information given above is correct to the best of my knowledge.


Date : Signature




[ Malaysia Online Resume Listing ] [ FAQ ]