SITE ENGINEER(PIPING) \NDT inspector\ QA\QC.

SITE ENGINEER(PIPING) \NDT inspector\ QA\QC.


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on April 02, 19101 at 20:25:49:

BIO-DATA


Name : PRABHAT R. NAIK.

Address : 402, Niloy CHS,
Bhidewadi,
Ambernath-421501
Dist: Thane.
Tel. No.911-600783.
prabhat_naik@yahoo.com

Date Of Birth : 29th June 1979.

Languages Known : English, Hindi, Kannada & Marathi.

Academic Profile:-
General : S.S.C.-1996 - Mumbai Board.

Technical : Diploma In Mechanical Engineering
Industrial Institute,Thane.

: ASNT LEVEL-II IN RT

Computers : AutoCAD R14,Solid Works,
MS -Dos, MS- Windows 95,
MS- Office, Internet.
Work Experience:-
Current employer : Hitek Engineering Services .
6/99 to till date
Major Projects Handled

Bharat Petroleum Corporation Ltd. (Delhi)
Site engineer
Responsible for all aspects of piping detailed engineer supervision of equipment erection of pipe work for utility & process. Responsibilities also included standing in for assist in job planning, man hour estimates, material take offs, assuring compliance with client procedures, and assisting commissioning, start up of the complex. Also compiled with as-built drawings, NDT and hydro test documentation for hand over to the client.

Indian Oil Corporation. (Mathura)
Site engineer/qa
Carried out entire piping execution from mtls collection to as built drawing
Drawing preparation, billing and extra claims. While I also ensured all the work was supervised, inspected, tested in accordance with the company’s safety I also assisted in pre-planning, site modifications, welding procedures, and general management of all mechanical activities on site.

Comaco Shipping.(Goa)
Site engineer
Responsible for the day to day operations of a three-vessel construction and maintenance spread. Arrange for personnel's rotations, and transportation. Ensured that all normal requirements for offshore operations were in place and available, i.e.: fuel, lubricants, consumables etc. Maintained contact with the client daily for the logistics of materials, work packs offshore visits as well as daily operations meetings. Included in the spread was one derrick barge with 12000-ton lift capability, one 85-man work boat, including all support vessels. Works included were heavy lifts up to 250 metric tons, new platform hook-ups, well head tie-ins, major and minor platform modifications and pipeline
repairs.

Bharat Petroleum Corporation Ltd. (Ajmer)
Site engineer/qa
Supervised a crew of some 80 pipe fitters, welders, and riggers on a 24 operation carrying out hook-up operations. Close cooperation with the planning department to ensure that the critical path of the project was maintained was essential Responsible for all aspects of piping. My duties include supervision of mechanical crew men installing and testing major piping systems ,and rectifying problems with existing systems, assist in
man hour estimate, assuring compliance with client procedures and assisting commissioning and start up of the complex.

Tata Electric Companies. (Mumbai)
Site engineer/qa
Construction supervision, co-ordinate with client and inspection agencies, estimation of steel structures piping equipment such as compressors, pressure vessel and hydro testing. I also assisted in pre-planning, site modifications, welding procedures, and general management of all mechanical activities on site.

2nd Last employer : Tacheon Machines Pvt. Ltd.(Mumbai)
3/99 to 6/99 as Design engineer
Designing of press tools, die casting, jig & fixtures, die, hydraulic cylinders, pistons, valves, machine design, for the manufacture of special purpose machines.

General
Familiarity with inspection codes and standards (ASTM & ASME)
Material identification and testing.
QA/ QC of piping fabrication jobs

My Aim
My aim is to gain a lot of knowledge in the which ever field am and be the best. I have
excellent problem solving skills, organizational skills detail oriented accurate and able to work under pressure to meet targets.


[ Malaysia Online Resume Listing ] [ FAQ ]