Posted by on March 29, 19101 at 22:44:05:
R E S U M E
NAME : LEONILO B. FERNANDEZ
ADDRESS : #706 Balib-Balic St., Vega Bongabon Nueva Ecija
FIELD OF EXPERTISE
Þ SURVEYING
Þ HIGHWAY DESIGN
Þ MATERIALS COST & ESTIMATES
Þ EARTH MOVING/EROSSION CONTROL MEASURE/BUTRESS FILL & SLOPE STABILIZATION
Þ GOLF COURSE DESIGN & CONSTRUCTION IMPLIMENTATION
Þ COMPUTER ORIENTED (Using MS office 2000 windows 98)
Þ STRUCTURAL DESIGN (using CAD from ver.11 up to 2000 & staad III software for Design)
Þ ABLE TO OPERATE COMPUTER SOFTWARE like ( Prima Vera for Project. Management,Softplan for Architectural Design,Corel Draw,Excel 2000,Word 2000.
Þ COMPUTER NETWORKING like (novell Netware,Modems,CC:Mail & Internets.)
Þ STRUCTURAL FORMWORKS using (RMD Forms, Versi Form & Form Apply)
WORKING EXPERIENCE
A. SITE SUPERINTENDENT (October 1999 - Present)
COMPANY : Raytheon Ebasco Overseas Ltd/ Washington
International
PROJECT : San Roque Multi Purpose Dam
Scope of Work :
Ø As a Site Superintendent, I have to see to it that the Schedule given by superior will be followed and executed on time.
Ø In-charge for about 120 people working on the Spillway of the Dam
Ø Form Works In-Charge for the construction of Galleries, Chute walls Left & Right, Main Drainage and its tributaries & Dental Clean-up.
Ø Concreting In-charge on all the areas involved under my supervision and see to it that the pouring activities meets to its highest quality & Standard.
Ø As a Superintendent, my main focus is the Safety of my people then working simultaneously with production.
B. SITE SUPERINTENDENT : (May 1999-October 1999)
COMPANY : GOLFORCE INTERNATIONAL
Project San Roque Multi-Purpose Project Dam
Scope Of Works:
Ø Slope Stabilization & Erosion Control as a contractor to Raytheon Ebasco Overseas Ltd.
Ø In-charge of Road Elevation 165 upstream side of the Main Dam to be used as Hauling road and a diversion of water for proper drainage while the construction of Copper Dam is on going.
Ø In-charge of all the Buttress Fill around the Operators Village to satabilized the slope with 6-8m 90% compaction fill from the toe of the slope up to the top of the slope.
Ø Transferred to Spillway of the Dam to In-charge Excavation including the 5m widths of Drainage benches in preparation for the construction of the whole Spillway.
C: SITE MANAGER : (From December 1998 - May 1999)
COMPANY : FIL-ESTATE GOLF & DEVELOPMENT INC.
PROJECT : FOREST HILLS GOLF & COUNTRY CLUB
SCOPE OF WORK:
Ø As a Site Manager my main Duties and responsibilities is to over see the whole construction of the Golf Course and report directly to the Project Manager.
Ø Handle 450 - 500 Manpower and 25-30 company owned equipments excluding the sub-contractor's.
Ø See to it that the forecasted schedule will be properly implemented.
D: SITE SUPERINTENDENT (August 1996- Aril 1998)
COMPANY: FIL-STATE GOLF & DEVELOPMENT INC.
PROJECT:FOREST HILLS GOLF & COUNTRY CLUB (NICKLAUS COURSE)
Ø Responsible for the interpretation of the plans, in relation to the actual grading and shaping of the different features of the GOLF COURSE construction.
Ø Responsible for the whole operation controlling and managing the distribution of the manpower, materials and equipments for proper utilization and monitoring.
Ø In-charge of all rough and fine shaping stage up to the finishing touches of the golf course construction.
Ø Assist all foreign and local shapers in implementing procedures in the construction.
Ø Coordinates with the design consultants in implementing the general design concepts and strategy of the golf course.
Ø Coordinates all the departments involved in the construction such as irrigation, civil works, landscaping, grassing, maintenance, motor pool, survey and the like.
Ø In charge of the budget cost preparation and scheduling for the whole golf course construction.
Ø Responsible for the coordination of all the adjacent areas such as, residential and the clubhouse, which involves tie-in of the golf course.
Ø Responsible for the coordination of the brgy.officials, mayors and all affecting
Ø Areas within or outside the golf course perimeter.
Ø Handles 4 00-500 manpower with 25-30 equipment in the site.
Ø Reports directly to the project manager and top management.
E:) AUTOCADD ENGINEER SUPERVISOR (OCTOBER 1995- AUGUST 1996)
COMPANY: FIL-STATE GOLF & DEVELOPMENT INC.
PROJECT: MANILA SOUTHWOODS GOLF & COUNTRY CLUB
SCOPE OF WORKS;
Ø Supervised the preparation of as-built plans based on the survey data, using ADMS, and GPS instruments.
Ø Supervised the preparation of the topographic map and plans using AutoCAD release 12 software's attached to a third party software's to generate contours, volume computations, profile, cross sections, cut and fill computations.
Ø Supervised the preparation of the site development plans, 3 dimensional view slope and elevation analysis, and using AutoCAD civil software for Cogo and digital terrain modeling.
Ø Assist all consultants, top management in all cad operations, such as digitizing plans, and data encoding.
Ø Performs computerized cost, materials and labor estimates.
Ø Performs other related duties as maybe assigned by the senior supervisors, project and site manager, consultants and the top management level.
Ø Reports directly to the senior supervisor.
F:) AUTOCADD ENGINEER (September 1994 - October 1995)
COMPANY; FIL-STATE GOLF & DEVELOPMENT INC.
PROJECT: MANILA SOUTHWOODS GOLF & COUNTRY CLUB
SCOPE OF WORKS;
Ø Prepares as-built plans based on the survey data, using ADM and GOS instruments.
Ø Prepares topographic map and plans using AUTOCADD release 12 software's attached to a third party software's to generate contours, volume computations, profiles, cross section, and even cut and fill computations.
Ø Prepares site development plans, land use plans, 3 dimensional view, slope and elevation analysis using AUTOCADD civil software for COGO and Digital Terrain Modeling.
Ø Assist all consultants, top management in all Cadd operations, such as digitizing plans, plotting and data encoding.
Ø Performs computerized cost, materials and labor estimates.
Ø Performs other related duties, as maybe assigned by the supervisors, project and site manager, consultants, and the top management level.
Ø Reports directly to the supervisor.
G:) AUTOCADD OPERATOR (July 1993 - September 1994)
COMPANY : DMI CONSULTANTS INC.
PROJECT : CONSULTANCY WORKS.
SCOPE OF WORKS.
Ø Draftsman using computer aided design AutoCAD release 12 for the plotting of plan and profile, cross section, digital terrain modeling and plotting of topographic map.
Ø Drafting and plotting of lot data computations, lot plans and area computations using AutoCAD release 12-computer software.
Ø Cost of material estimates using lotus 123 software.
H:) SURVEY CHIEF OF PARTY (September 1992 - July 1993)
COMPANY : DMI CONSULTANTS INC.
CLIENT: DPWH
Project undertaken: survey of tanguay yabel- mayoma, gurong gurung and sta. River in zambales.
SCOPE OF WORKS:
Topographic survey, cross section and profile of tanguay-yabel river at sta. Rita olongapo zambales. The result must be submitted to DPWH planning and design of the proposed engineering inventions for the control and mitigation caused and damaged by lahar eruption of mt. Pinatubo.
a.) CLIENT: DCCD ENGINEERING & TECHPHIL CONSULTANTS.
PROJECT UNDERTAKEN: road parcellary survey of san mateo and common wealth ave.
SCOPE OF WORKS :
Ø Responsible for the consolidation and encoding of all survey data, for the proposed road right of way using Microsoft excel 5.0 for windows software.
b.) client: DPWH (MINUTE FRINGE II)
Project undertaken :
Ø survey and design of all rehabilitation roads for metro manila project
scope of works:
Ø Quantity surveyor involved in the preparation of the detailed engineering design of roads, quantity take off, bill of materials and the design analysis.
c.) CLIENT: PALMERA HOMES INC.
PROJECT UNDERTAKEN: Carissa Homes, NORTH III SUBDIVISION
SCOPE OF WORKS :
Ø Establishing horizontal and vertical controls.
Ø Prepares lot data computations.
Ø Area computations.
Ø Monumenting.
Ø Preparation of lot plans.
Ø Technical descriptions.
Ø Consolidation of boundaries.
d.) CLIENT : MULTI INFRA KONSULT INC (MIKI) and DPWH (106.0 kms.)
PROJECT UNDERTAKEN: SURVEY OF MARAMAG _ KABAWE BUKIDNON ROAD
SCOPE OF WORKS:
Ø Instrument man, responsible for the layout of the horizontal curves and points of intersections, horizontal and vertical control.
Ø Conducts cross section of profiles.
Ø Plotting of plan and profile for the design of the consultants.
f.) CLIENT: DCCD CONSULTANTS
PROJECT UNDERTAKEN: CALINAN DAVAO- BUKIDNON ROAD (161.0
kms.)
SCOPE OF WORKS:
Ø Instrument man responsible for the layout of the horizontal curves and points of intersections horizontal and vertical control.
Ø Conducts cross section of profiles
Ø Plotting of plan and profile for the design of the consultants.
g.)CLIENT: DCCD CONSULTANTS SUB- CONTRACTED TO DPWH
PROJECT UNDERTAKEN: PANGASINAN REHABILITATION II PROJECT SURVEY OF EARTHQUAKE DAMAGED.
SCOPE OF WORKS:
Ø Instrument man, responsible for the layout of the horizontal curves and points of Intersections, horizontal and vertical control.
Ø Conducts cross sections and profile.
Ø Plotting of plan and profile for the design of the consultants.
Ø In charge of the layout of the blue topping for the construction of road design and elevation.
h.) CLIENT: PLANDESCON INC.
PROJECT UNDERTAKEN: KALINGA- APAYAO ROAD SURVEY.
SCOPE OF WORKS:
Ø Instrument man, responsible for the layout of the horizontal curves and points of Intersections, horizontal and vertical control.
Ø Conducts cross sections and profile.
Ø Plotting of plan and profile for the design and elevation.
EDUCATIONAL BACKGROUND
COLLEGE : UNIVERSITY OF MINDANAO
BOLTON ST. DAVAO CITY.
DEGREE IN BACHELOR OF SCIENCE IN CIVIL
ENGINEERING (MARCH 1990)
SECONDARY: SINUDA BARANGAY HIGH SCHOOL
SINUDA, KITAO-TAO BUKIDNON (MARCH 1985)
ELEMENTARY: BAYBAY, MALALAG ELEMENTARY SCHOOL
BAYBAY, MALALAG DAVAO DEL SUR (MARCH 1980)
OTHER SKILLS:
Þ can operate base and lead guitar.
Þ can operate service vehicles 2 wheel and 4 wheel drives.
Þ bobcat w\ 4 in 1 bucket skid loader john Deere
Þ can operate heavy equipment such as D4h, D5m, D8r & D9n.
PERSONAL DATA
NAME : MR. LEONILO B. FERNANDEZ
BIRTTH DATE : JANUARY 15, 1967
AGE : 34
SEX : MALE
STATUS : MARRIED
NATIONALITY : FILIPINO
LANGUAGE SPOKEN : VISAYA, TAGALOG, ENGLISH
HEIGTH : 5'
PROVINCIAL ADDRESS : # 706 BALIC- BALIC ST. VEGA BONGABON
NUEVA ECIJA
CITY ADDRESS : FOREST HILLS GOLF AND COUNTRY CLUB
FEGDI BASE 2 INARAWAN ANTIPOLO RIZAL
CONTACT NO. : 0919-2409237 / 0919-6011054
CHARACTER REFERENCES
1.) MR. JIM LOCKARD, GEN. SUPERINTENDENT LEFTSIDE ABUTTMENT SAN ROQUE DAM- MULTI PURPOSE PROJECT
2.) ENGR. RAY EMILLO ERAN - AVP FOR THE CONSTRUCTION, FIL- STATE GOLF AND DEVELOPMENT INC.
3.) MR. EULOGIO E. DELA CERNA - CADD DEPARTMENT SUPERINTENDENT FOR PLANNING AND CONSTRUTION DESIGN
4.) RET. COL. LUBATON- RETIRED COLONEL OF THE ARM FORCES ISSAF
5.) MR. ROBERTO R. ESCANO - VP FOR PLANNING AND DESIGN OF THE GOLF COURSE FIL- STATE GOLF & DEVELOPMENT INC.
6.) ENGR. IREO S. BANES -AVP FOR THE CONSTRUCTION, FIL STATE GOLF & DEVELOPMENT INC.
7.) MR. ALEXANDER TOMAWICZ - Spillway General Superintendent SRMP Project
8.) MR. PAGE WARD - Spillway Superintendent SRMP Project
MAILING ADDRESS:
1.) #706 BALIC-BALIC ST. VEGA BONGABON
NUEVA ECIJA
2.) Admin Bldg. Raytheon Ebasco Ltd- Operator Village San Roque Sn Manuel
Pangasinan.
CONTACT TEL. #: 0919-2409237/0919-6011054