Posted by on February 16, 19101 at 20:06:06:
CURRICULUM VITAE
NAME : GURUNG DEVI JANG
DATE OF BIRTH : 1962
MARITAL STATUS : Married
ADDRESS : P.O.Box 10715
Kathmandu
Nepal.
Phone:977-1-524245
e-mail : djg@mos.com.np
NATIONALITY : Nepali
ACADEMIC QUALIFICATION : Passed certificate level (Diploma in Engineering) from INSTITUTE OF ENGINEERING CAMPUS Pulchowk, Kathmandu, Nepal in First Division.
Passed School Living Certificate in highest 2nd Division. From SLC Board Nepal.
O. QUALIFICATION : Diploma in Computer (Basic Course)
LANGUAGE : Nepali, English, Hindi and Gurung.
WORK EXPEIRIENCE :
Aug. 1991 to Cont.
Employer
Position
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
Dec. 1998 to Till Date
Project (Under Construction)
Employer
Position
Duties and Responsibilities
Tribhuvan International Airport Hanger Area Improvement Project ( Phase # 3)
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Management for all site.
– Controlling the all staffs.
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern.
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
–
June 1997 to Nov. 1998
Project
Employer
Position
Duties
EROM - 2, RC-5 Charali - Durgapur, Jhapa Highway Project.
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Management for all site.
– Controlling the all staffs.
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern.
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
Nov. 1996 to June 1997
Project
Employer
Position
Duties
Jan. 1995 to Jul 1996
Project
Employer
Position
Duties
Reconstruction of Samari Bridge
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Management for all site.
– Controlling the all staffs.
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern.
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
Prithvi Highway Flood Damage Repair. Project Package # 15, 20
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Management for all site.
– Controlling the all staffs.
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern.
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
Aug 1991 to Dec. 1994
Project
Employer
Position
Duties
Charali to Ilam Road Project
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern).
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
July 1992 to Jun 1991
Employer
Project
Position
Duties
Jan. 1984 to Jul 1990
Employer
Jul 1987 to Jul 1990
Employer
Project
Position
Duties Responsibilities
Dec. 1986 to Jul. 1987
Employer
Project
Position
Duties Responsibilities
CEGELEC CONSTRUCTION COMPAY FRANCE
132 KV Transmission line, Nepalgunj to Mahendranagar.
Surveyor and Civil Work Inspector for Attaria and Mahendranagar sub-station buildings.
Layout, Leveling, Quality Control, Preparation of Construction Sub-Drawing and Supervision of all Types of Structures such as : Sub-Station Building, Foundation Blocks, Cable Duct, Drainage, Road (Internal Access), Culverts, Brick Works, Plastering, Painting, Sanitary, Terrazzo Flooring, Septic Tanks, Transformer Foundation, and Reactor Foundation etc.
– Preparation of work schedule.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
CEMAT Consultant (P) Ltd. Nepal.
Renardet Consulting Engineers S.A. Switzerland. in associate with CEMAT Consultant (P) Ltd. Nepal.
Nepal Feeder Road Project (Financed by Asian Development Bank (ADB) located at Far Western Region, Nepal. (CH. 000+000 to CH. 101+500 km Godavari to Bhatkanda Contract # 2 Construction Phase)
Quantity Surveyor
Survey, Preparation of Construction Drawing, Quality Control.
Checking of Monthly Certificates which is submitted by Contractor Korean Development Corporation known as KDC
Construction Supervision such as : Bridge, Box Culvert, Slab Culvert, Pipe Culvert.
Protection Works : Gabion Works, Masonry Works, Drainage etc.
Road Pavement Works : Sub-Base, Base-Course and Black-Top and Land Slide Protection Works etc.
In this alignment near by CH. 4+000 km. Due to heavy land slide changed the new alignment about 2+700 km completed all detail survey, Plotting, Estimating etc. by myself.
Luis Berger International Inc. USA and Renardet Consulting Engineers S.A. Switzerland in associat with CEMAT Consultant (P) Ltd. Nepal and EAST Consultant (P) Ltd. Nepal.
Nepal Feeder Road Project (Financed by Asian Development Bank (ADB) located at Far Eastern Region, Nepal.
Quantity Surveyor
Feasibility and Geotec Survey in Eastern Region from Gaighat-Diktel and Chatara to Bhojpur.
Busy in office with drafting works, plotting and calculation of all field books and related works.
Jan. 1986 to Dec.1986
Employer
Project
Position
Duties Responsibilities
CEMAT Consultant (P) Ltd.
Hadetar Irrigation Project Lamjung, Nepal.
Nepal Rastra Bank Building, Dhangadhi, Far West Nepal.
Quantity Surveyor
Detail Survey in field :
Office Work : Calculating, Plotting, Drawing and related works of Haditar Irrigation Project.
Estimating and Drawing of Nepal Rastra Bank.
Design, Drawing and Estimating for Residential Buildings.
May 1985 to Jan. 1986
Employer
Project
Position
Duties Responsibilities
Renardet Consulting Engineers S.A. Switzerland. in associate with CEMAT Consultant (P) Ltd. Nepal.
Nepal Feeder Road Project
Quantity Surveyor
Detail Survey in Far Western Region, Godawari to Bhatkanda and Bhatkanda to Dipayal.
Topographical Survey, Calculating, Quantity Estimating, Drawing, Plotting of L-Section, X-Section and related works.
Jan. 1984 to May 1985
Employer
Project
Position
Duties Responsibilities
CEMAT Consultant (P) Ltd. Nepal.
Mahakali Irrigation Project, Far Western Region, Mahendranagar, Nepal.
Bhaktapur Surface Drainage.
Quantity Surveyor
Calculating, Plotting, Drafting, Estimating and related works.
Design, Drawing and Estimating of Residential Buildings.
Jan. 1983 to Jan. 1984
Employer
Project
Position
Duties Responsibilities
HMG Public Work Development Section, (Jomsom Mustang) located at North West Remote Place.
Local Projects (Finance by Local Source of HMG Nepal).
Sub-Overseer
Survey, Design, Estimating of Office Building, Health Center Building, Renovation of Historical Temples such as (Muktinath Temple), Water Supply, School Building, Local Wooden Bridges, River Protection Work, Irrigation, Landslide Protection, Mule-Track, etc.
All the mentioned Projects are constructed under supervision of this office. As a member of this office I am directly involved.
Yours Faithfully,
GURUNG DEVI JANG