piping designer /sr. draughtsman

piping designer /sr. draughtsman


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on November 11, 19100 at 12:59:41:

From

SAJI VARGHESE
BLK-249, #08-184
BUKIT BATOK EAST AVE -5
SINGAPORE 650 249


Dear Sir,

Sub: Application for the Post of PIPING DESIGNER / PIPING DRAUGHTSMAN

I came to know that there exists a vacancy for the above mentioned post in your esteemed

organisation.So I hereby submit my detailed RESUME for your kind consideration. I

hope that you will consider this application favourably on my part. I assure you that I

will make every effort worthy to the development of the company.

Thanking you,

Yours sincerely,


(SAJI VARGHESE)

CURRICULUM VITAE

Personal Profile

Name : SAJI VARGHESE

Father’s Name : Thomas Varghese

Date of Birth : 25-05-1970

Address for Communication : Blk -249, #08-184,
Bukit Batok East Ave - 5
Singapore - 650 249

Contact Phone No. : (65)-3854604 , 8974234-RESI.)
( (65)-2625950-OFF.)

Permanent Address : No.62, IInd Main Road,
Senthil Nagar, Porur,
Chennai - 600 116.
INDIA.

Educational Qualification : Diploma in Mechanical Engineering

Class : Second

Languages known : English, Tamil, Malayalam

Nationality : Indian

Passport Details

Passport No. : M118507

Place of Issue : Cochin

Date of Issue : 24-08-1992

Validity : 23-08-2002


Computer Knowledge : Autocad Rel.12
Autocad Rel.13 (Windows Version)
Autocad Rel.14 (Windows Version)


Professional Experience


Professional Experience : 10 Years


Area of Expertise : Design and preparation of piping general
arrangement drawings, isometric
drawings, preparation of piping spool
drawings,Isometrics for shop fabrication,
pipe support detailed drawings, Bill of
material. Tank form layouts, pipe rack and
as built drawings. Preparation of Statuary
(IBR) drawings and Nozzle orientation
drawings.

Civil structural Interference checking,
Vendor drawing review of Pressure vessels,
Heat exchangers, Storage tanks Co-rdination
of Inter-disciplinary activities.

Employment History

i) M/s. AUDEX Pte Ltd, Singapore- 619973

Post Held : Sr. D’person

Period : Oct 1999 till date
About the company : The company specialises in Designing and
Erection of Refinery and Petrochemical,
Oil and Gas pipelines


ii) M/s. Deutsche Babcock Internation Development and Engineering Associates Limited, Chennai - 34.

Post Held : Sr.D’person

Period : Jan 1995 to Sept 1999
About the Company : Subsidary of Deutsche Babcock
ARTIGESSELSCHAFT GmbH, Germany.
This is one of the leading Engineering
consulting firm in India dealing Chemical,
Petro-Chemical, Oil & Gas and Energy sector.


iii) Draftech Design and Marketing Services (P) Ltd., Chennai - 35.

Post Held : D’Person

Period : Aug 1991 to Jan 1995

About the Company : One of the leading engineering consulting
firm in India and abroad dealing with boiler,
Refineries, Petrochemical and Power Plant.

LIST OF PROJECTS

OIL & NATURAL GAS INDUSTRY

1. Project : Neelam Project

Client : ONGC

Consultant : John Brown (P) Ltd

Year : 1992

Responsibility : Preparation of piping, general arrangement
drawings, Isometrics, drawing, support details
and nozzle orientation.

2. Project : LPG Storage Installation, Tuticorin

Client : SPIC - SMO

Year : 1993 - 94

Responsibility : Preparation of tank form layout, bill of
material and piping supports.

3. Project : Utilities and Offsites

Client : ONGC, Gandhar, Phase-II

Consultant : Engineers India Limited

Year : 1994 - 1995

Responsibility : Design and preparation of piping
Layout, bill of material and isometric
drawings.
4. Project : Water Injection Revamp

Client : Command Petroleum India Ltd.,

Year : 1996 - 97
Responsibility : Preparation of piping layout, isometric
drawings and support details.
REFINERIES

1. Project : LUBE EXPANSION PROJECT

Client : Madras Refineries Ltd

Consultant : EIL

Year : 1993 - 94

Responsibility : Preparation of isometric and bill of
material and as built drawings

2. Project : OIL MOVEMENT AND STORAGE (OM&S)
AUTOMATION.

Client : Hindustan Petroleum Co. Ltd

Consultant : ABB (ASEA BROWN BOVERI LTD)

Year : 1999

Responsibility : Modification of piping layout and
isometric drawing. Preparation of
spool isometric and BOM.

3. Project : PROPOSED ADDITION OF T-157 AT PULAU
BUKOM BESAR & KECHIL FOR
CONDENSATE SPLITTER UNIT(OFF-PLOT)

Client : Shell Eastern Petroleum Pte Ltd

Consultant : CBI Overseas

Year : 1999 - 2000

Responsibility : Preparation of tank foam layout, fire water
Isometrics, bill of material and foam pourer
piping System.

PETROCHEMICAL INDUSTRY

1. Project : 125 TPD pre-oriented yarn project

Client : Raymond Synthetics Ltd, Allahabad

Year : 1994 - 95

Responsibility : Design and preparation of piping
Layout and Isometrics, IBR & MTO.

2. Project : 160,000 TPA POY Project

Client : Reliance polyethylene Ltd

Year : 1995

Responsibility : Preparation of piping layout, isometrics,
support details and IBR drawing for
Area - 300

3. Project : 2500 TPA PTA Project

Client : SPIC Petrochemicals Ltd, Madras

Year : 1995 - 96

Responsibility : Preparation of piping layout for
utility area. Preparation of isometric
drawings and Nozzle orientation.

4. Project : P T. PETRO OXO NUSANTARA .GOP.
PROJECT

Client : MITSUBISHI HEAVY INDUSTRIES
LTD, JAPAN

Year : 1996 - 97

Responsibility : checking and updation of piping layout.
preparation of piping isometric drawings
and bill of material and tank farm area.

5. Project : P.T. SIAM MASPION POLYMERS PVC
PLANT (250 MTPA PVC PROJECT)

Client and licenser : SUMITOMO chemical Engineering Ltd,
Japan.

Year : 1997 - 98

Responsibility : Involved in the piping layout of
polymerisation area. preparation of pipe
rack drawings and tank farm layour , and isometric
drawing.


6. Project : 290 MTPA pyrolysis gasoline
hydrogenation (PGH)

Client : Haldia Petrochemicals Ltd, West Bengal

Consultant : Bechtel/EIL

Year : 1998 - 99

Responsibility : Preparation of piping layout around heat
exchangers and pressure vessels.
preparation of piperack layout Isometric
and IBR drawings.

7. Project : C4 Hydrogenation unit

Client : Haldia Petrochemicals Ltd, West Bengal

Consultant : Bechtel/EIL

Year : 1998 - 99

Responsibility : Design and preparation of piping
Layout around reactor and coloum areas pipe rack. Preparation of IBR drawings and Nozzle
Orientations.


7. Project : Oil Storage Tank

Client : Petrochemical Corpration Of Singapore

Consultant : CBI

Year : 2000-2001

Responsibility : Design and preparation of piping
Layout, Isometric, Support detail
Nozzle Orientation And Bill Of
Metrial.


POWER PLANT

1. Project : 1 x 25 MW captive power plant


Client : Larsen & Toubro Ltd

Year : 1999

Responsibili : Preparation of piping layout, support
details and bill of material.

2. Power : Al-zara thermal power station

Client : Mitsubishi Heavy Industries Ltd,
Japan.

Year : 1997

Responsibility : Preparation of piping layout, support
details, bill of material, isometric
drawings.


[ Malaysia Online Resume Listing ] [ FAQ ]