Telecommunication Engineer

Telecommunication Engineer


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on July 08, 19103 at 20:25:14:

CURRICULUM VITAE

NAME : MAHENDRAN S/O SETHURAMAN


PERSONAL DETAILS : DATE OF BIRTH – 22nd OCTOBER 1973
MALE
MALAYSIAN

EDUCATION : 2001 B.ENG IN ELECTRONIC SYSTEM DESIGN
UNIVERSITY OF NORTHUMBRIA AT NEW CASTLE
TAFE COLLEGE

2000 HIGHER DIPLOMA IN ELECTRONICS & ELECTRICAL
UNIVERSITY OF NORTHUMBRIA AT NEW CASTLE

1995 DIPLOMA IN ELECTRONICS ENGINEERING
FEDERAL INSTITUTE OF TECHNOLOGY

JOB OBJECTIVE :

To obtain a spectacular experience and remarkable exposure as such to built and strengthen up my technical engineering skills where professionalism as well as challenging responsibility will contribute to my future rapid growth organization. Able to work under stressful situation and arduous condition.

PROFESSIONAL GOALS :

Seeking a position as an O&M/Transmission/C&I Senior Engineer/Telecommunication Consultant/Project Coordinator or Related with my qualification and experience within a growth-oriented firm.

EXPERTISE :
Project management and implementation, Testing and Commissioning of Motorola BSS Equipment, process analysis, quality management, BSS and Transmission equipment troubleshooting and analysis and Preventive Maintenance.

PROFESSIONAL EXPERIENCE


MAY 2003- PRESENT MOTOROLA NIGERIA

I’m the Electrical Engineer for ECONET BTS Installation network and have experience carrying out the following tasks: -

Project: Motorola Nigeria
Location: African Reinsurance Building, 6th Floor
Plot 1679, Karimu Kotun Street,
Victoria Island,Lagos
Period: 5th of May till Present
Task:
Responsible for the Installation and Commissioning of shelters, Motorola bts, Harris Farinon microwave, Rectifier, ACDB, Generator, ATS, AMF Panel, Voltage Stabilizer and Air Condition. Preparing ATP Checklist for Construction, BSS equipments and Microwave equipments.
Supervising sub-contractors to ensure proper Installation of equipments in shelter. Handling the final Quality ATP check before the shelters leave to sites.

APRIL 2003- MAY 2003 LEIGHTON CONTRACTORS (MALAYSIA)

I was the Project Engineer BTS Installation for Leighton Contractors and have experience carrying out the following tasks: -

Project : Leighton(Maxis Communication Bhd)
Location: Leighton Contractors (Malaysia) Sdn.Bhd
14th Floor, Menara Multi-Purpose
No 8,Jalan Munshi Abdullah
Malaysia
Period : 1st of April till May 2003
Task :
Handling Duplexer swap and RF Antenna, BTS and Feeders Installation for Maxis sites. Coordinating projects and materials planning during the project period. Swapping from PGSM to EGSM Duplexer to support the Extended GSM channels. Preparing tenders from subcontractors for East and West Malaysia for Maxis Turnkey contracts. Supervising subcontractors, collection of site documents from Sub-contactors and coordinating subcontractors during the tenure of the project.
Coordinating materials from Warehouse. Preparing daily report to Engineering Communications Manager.

DECEMBER 2001-JANUARY 2003 MOTOROLA THAILAND

I was the Regional Quality Auditor for Motorola and have experienced carrying out the following tasks: -

Project : MOTOROLA TA ORANGE
Location: CHIANG MAI, THAILAND
462,Chiang Mai-Lampang Rd, Nongpakrung 2,Kawilla,
Muang,Chiang Mai,50000,Thailand.
Period : Dec 2001 till Jan 2003
Position: Regional Quality Auditor
Task :
Ensuring the qualities to be within Detailed System Design (DSD) specification.
The purpose of the Project Quality function is to support the project management in quality
deployment of network and continuous improvement of the project operations towards Project
Excellence.
The equipments that I have handled are as below:

BTS INSTALLATION
RECTIFIER INSTALLATION
POWER INSTALLATION (AC and DC SYSTEM)
TRANSMISSION INSTALLATION (MICROWAVE EQUIPMENTS &FIBER OPTIC SYSTEM)
ANTENNA and FEEDERS SYSTEM
CIVIL CONSTRUCTIONS PART

RESPONSIBILITIES & SUPERVISING CONTRACTORS INORDER TO MAINTAIN QUALITY OF:
a) BTS INSTALLATION and ACCEPTANCE
1.Supervising the installation and Commissioning of Motorola Horizon Macro CDMA BTS EQUIPMENT
2.Supervising the BTS, FEEDERS, CABINETS, RACKS and TRAYS to be properly grounded and within specification of Motorola and TA Orange

b) RECTIFIER INSTALLATION and ACCEPTANCE
1.Supervising the Installation of Eltek Rectifier & Batteries to be within Specification

c) POWER INSTALLATION (AC & DC SYSTEM)
1.Supervising the Installation of AC 3 Phase System to be within Specification
2.Supervising the Installation of DC System to Equipments
3.Test run the Standby Generator
4.Supervising the Installation of Air Condition system.

d) TRANSMISSION INSTALLATION & ACCEPTANCE
1.Supervising the Installation of MICROWAVE EQUIPMENTS, at both BTS & BSC container
2.Supervising the Installation of DMC IDU & ODU Microwave(Tower) and Alcatel HDSL Leased line equipment
3.Verifying the wiring status of dmc idd, lightning arrestor and fuse panel
4.Transmission Rack, NType cable & 16”grounding cables

e) ANTENNA & FEEDERS SYSTEM
1.Supervising the Installation of ANTENNA & FEEDER SYSTEM, FEEDER length & Grounded Kits to be within Specification
2.Ensuring the quality of Antenna Orientation and tilt.

f) CIVIL PARTS & CONTRUCTIONS
1.Lightning & Equipments grounding cables size to be within the Detailed System Design (DSD) specification
2.To ensure the Lightning grounding resistance to be within spec.
3.Wall penetration with waterproof treatment
4.Power Cables size to Code in contract specification
5.Ensuring that the External alarms (EAS) are working properly
6.Ensuring the container is built within spec
7.Ensuring the tower is built and erected within spec
8.Ensuring the lightning arrestor is installed within spec
9.Ensuring the container’s internal and external ground is installed within spec
10.Ensuring the grounding of tower is installed within spec
11.Ensuring the soil test is done within spec

g) RF QUALITY
1.Working closely with Drive test team to ensure better handovers between bts and to minimize drop calls.
2.Working closely with RF planner to ensure the antenna orientation to be within spec.
3.Knowledge of using MAPINFO 5 for RF planning purpose.
4.Able to perform Rf Optimisation.

Main tasks are to work closely with Construction Manager, Implementation Manager, Installation Supervisor, Site Supervisor, Field Implementation Engineers and Sub-Contractors to ensure quality of bts sites.
Providing weekly quality progress report to South Asia Motorola Quality Manager.
Providing weekly quality performance metrics to Regional Manager and National Quality Manager.
Working closely with Project manager and Regional Manager to ensure network Quality.
Involved in site acceptance with TA Orange and vendors.
Performing site audits and site supervision during site construction to ensure safety and quality.
Performing quality check at Rooftop environment, tower, grounding system,
Main Distribution Board, Motorola bts cabinets, DMC microwave transmission system, Alcatel HDSL fibre leased line modem, guyed mast, Air Conditioning system and structural related issues.
Managing and following up with Sub-Contractors to ensure quality of Installation, Testing and Commissioning of Horizon Macro and Microwave are not compromised.
Handling defects of new built bts sites and to follow up with contractor to solve all the problems. Raising flags to Project Manager if there are any major or minor qualities issues. Preparing construction and implementation deficiency weekly reports for Regional and Project manager.
Conducting training and self-development program for vendors to enhanced quality.
Handling Supplier Evaluation for all the Approved Suppliers for Motorola. Coordinating with BFKT and TA Orange Project to conduct evaluation for all the Approved Suppliers and also involved in Suppliers Evaluation & Selection Process.
Handling Site handover Documentation (MS130) during Site acceptance process within Motorola and TA Orange.
Working closely with Implementation team to provide smooth operation of Equipment delivery.


APRIL 1996 – DECEMBER 2001 MAXIS COMMUNICATIONS SDN BHD
No 5,Jln Kartunis U1/47,Temasya Ind.Park,
Glenmarie, 40150,Shah Alam,Selangor D.E,
Malaysia
Operation & Maintenance Department

I was a BSS Engineer with Maxis Communication and have experienced carrying out the following tasks: -

· I was handling all the 1st level and 2nd level fault related issues for Motorola equipment, Harris Microwave, SDH (Siemens) and Fiber Nodes.
· Testing and Commissioning of new Motorola BTS, BSC and microwave equipment as well as BTS expansion projects
· Testing and Commissioning of Micowave Harris Farinon- 7GHz, 15GHz and 13GHz.
· Testing and Commissioning of Fiber Nodes.
· Integration of Motorola BTS (Incell,Excell,M-cell,Microcell and Horizon Macro)
· Fault rectification and restoration at BTS, BSC and XCDR level (Motorola)
· Fault rectification and restoration of microwave equipment – Quadralink (7 GHz), Globestar (15GHz), Microstar (15Ghz) and Glenayre Spread Spectrum (2.4Ghz)
· Fault rectification and restoration of LG-CELL and MIKOM fiber repeaters (indoor active repeaters)
· Usage of Hewlett Packard signal generator, frequency counter, Anritsu fdr (vswr) meter, RF power meter, PDH tester, Sunrise bit error tester,
· Running RG59 and twisted pair cables for BTS, BSC, XCDR, DSX and balun works
· Maintenance of AC DC power system
· Lead in Preventive Maintenance team planning and reporting preventive maintenance actions and scheduling
· Providing hands on training on Motorola BTS, Quadralink, Globestar and Microstar PDH to new technicians and engineers
· Working with Siemens SDH fibre optics equipment
· Performing drive test and Analyzing using GSM TEMS.
· Performing test call and Network Expansion(Upgration)
· Performing Optmisation for Cellular Network
· Carrying out drive test optimization for BSC migration and reparenting of BTS sites, where handover’s for inter BTS, BTS to BTS, BSC to BSC and MSC to MSC is monitored using TEMS drive tool. Neighbouring frequencies are also monitored for the handovers and data collection.
· Lead in In-Building (Indoor) maintenance which consists of manpower planning and technical resolutions
· Experienced in carrying out Ericsson in building walk test.
· Resolving in-door coverage faults
· Worked closely in KLCC Twin Tower to resolve all the VIP complaint.
· Professional in handling all the Indoor coverage issues.
· Involved in Site acceptance from Design to Operation group. I was in-charge for site acceptance from Design group. Conducted checks at site based on Maxis specification.
· Knowledge in splicing of fibre optics.
· Supervising fibre optics cable laying.
· Handling the DC and AC Electrical troubleshooting in BTS Cabins
· Troubleshooting Electrical Stabilizer for AC system.
· Basic knowledge on GPRS network.


Below are the tasks that I carried out during the lead of Indoor Maintenance:

Period: June 01- December 2001

I was the lead in Indoor Building Maintenance for Operation and Maintenance Department.
Managing all the VIP complaint at all Indoor building in Klang Valley.
Resolving all the poor coverage issues at Petronas Twin Tower Kuala Lumpur.
Worked closely with RF and Optimization team to obtain spectacular network quality.
Performed walk test using TEMS Investigation and resolving all the bad coverage issues.
Performing VSWR test for passive repeaters. Performing power level test using power meter for active repeater system. Maintained MIKOM and LGCELL active repeaters.
Performed hands on training for technician towards troubleshooting faults in Indoor situation.

Below are the tasks, which were carried out during Preventive Maintenance:

Period: June 98 – August 2000.

Lead in Preventive Maintenance. Handling technicians for Preventive Maintenance roll out. Preparations of master schedule for site roll out. Managing technicians to conduct PM at site. Coordinating contractors to carry out civil work at site. Coordinating contractors to carry out Tower, Structure and Grounding Preventive maintenance.
Managing spares logistics for contractors and technicians.
Preparing weekly reports on PM roll out.
Scheduling re-visits to sites, which are due to, captured alarms. Involved in ISO 9002 documentation. Represented Preventive Maintenance team for documentation purpose.

Below are the projects I was involved during my tenure at Maxis: -

Project : Project ANI(Accelerated Network Improvement)
Period : February 01 – June 01:
Task : Performing network clean up as always recommended
Solving quality related problems at BTS sites due to high path imbalance and high
MA. Performing antenna replacement, recalibration of carriers and replacement of faulty hardware’s.
Conduct antenna change exercise from 85 deg beam width to 65 deg beam width.
Perform antenna orientation (Antenna tilting and antenna azimuth) to update CPT (Cell Planning Tool).
Involve in IOS (Intelligent Optimization System) in Klang Valley, Malaysia with Motorola personal to retune radio frequencies.
Worked closely with RF and Optimization Engineers to improve network quality.

Project : Project Get Well
Period : August 00 – Dec 00:
Task : Performing site clean up as always recommended
Worked with British Telecom Consultant and Motorola personnel’s for this project. Scheduling and planning of site roll out.
Conducting antenna validation check by using FDR and TDR meter.
Conducting antenna orientation (azimuth and tilt) due to down grade of coverage. Managing logistics to be used at site. Scheduling contractors for site roll out.Carry out grounding cable verification on all the feeder cable, antenna, and equipment inside an outside BTS cabin.
Performing complete site re-commissioning on BSS, Microwave and Fibre Optics Transmission, AC & DC, Civil Cabin Structure, RF, DC and AC Ground.

Project : Installation of M-Cell Arena
Period : Jun 98-Dec 98
Task : Swapping of M-cell Micro to M-Cell Arena
Installation and commissioning of M-Cell Arena (Microcell)


Project : PDH/SDH Microwave Cleanup
Period : Jan 00- Jun 00
Task : Clearing PDH/SDH alarms which were captured during routine Preventive
Maintenance.
Lead in PDH/SDH alarm Cleanup Project.
Scheduling using Microsoft Project and Excel and handling technicians for troubleshooting process.
Managing contractors to adhere to Master schedules.
Managing spares logistics to be used at site
Managing test gears for technicians.
Preparing weekly reports on the microwave cleanup project.


Below are the training's' I have attended: -

· Motorola BSS02B Topcell and Excell BTS
· Motorola CPO2 Introduction to Digital Cellular
· Motorola BSS03 Appreciation
· Motorola MC06 Mcell Appreciation
· Motorola MC09 BTS Products Technical Appreciation
· Synchronous Digital Hierarchy Fundamentals by Hewlett Packard
· Pan Dacom HDSL Fibre modem
· LG Cell (RF signal to Optical Signal converter)
· CPR
· Workplace First Aid CO2 Fire Suppression
· Four Wheel Drive Training
· Tower Climbing and Minor Rigging
· Roof Top Safety
· Optical Technologies (SDH Planning)
· Basic Skills Work at Height Training Course by BRC Work at Height in Thailand


Test Gears, which I have handled:

· Voltage Standing Wave Ratio – Wiltron Meter (fdr).
· HP Digital Power Meter
· HP Signal Generator.
· Bird Power Meter.
· Sunrise BER Tester.
· HP Bit Error Rate (BER) Tester.
· TEMS Drive Tool. – TEMS Classic & TEMS Investigation
· Ericsson Walk Tester – In building Coverage Tester.
· Fiber optics measurement test gear (OTDR).
· Spectrum Analyzer.
· Fluke Multi meter
· Frequency Counter


Skills
Proficient with Microsoft compatible system including Ms Word, Ms Project, Ms Mail, Power Point, Excel, WinNT, Visual Basic, Macromedia Flash 5, C++, HTML, Hyper Terminal, ProComm Plus, Map Info and TEMS Investigation.

Reference
Reference will be provided upon request.


[ Malaysia Online Resume Listing ] [ FAQ ]