any

any


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on July 05, 19103 at 19:07:10:

NAME : SANTANU DAS MAJUMDAR

SPECIALISATION : PIPING ENGINEERING

EDUCATION : Passed Draftsmanship (Mechanical) from Industrial Training Institute, Tollygunge, West Bengal in 1988.

Passed A.I.T.E. (Mechanical) from Industrial Training Institute, Tollygunge, WB. in 1993 (Stood first in order of merit in WB).
AutoCAD passed in 1995, from J.J. Computer Center, Calcutta

EXPERIENCE : 14 years

PERMANENT ADDRESS : 176/3/4, Panchanan Tala Road, Kolkata – 700041.
Ph : 033 402 2101(temporary hold)

DATE OF BIRTH : 14th, September 1966

MARITAL STATUS : Single

PASSPORT DETAIL : Passport no: T-356444; Date of Issue : 29.08.1995;
Place of Issue: Kolkata; Valid Upto: 28.08.2005

E-MAIL : sdm176@indiatimes.com


ASSIGNMENT : With Development Consultants Private Ltd.(1992 - till date)

From 2003 - till date
Presently working As Sr. Designer P & ID, FD, GA- Project-Uranium Ore Processing At Turamdih by Uranium Corporation Of India Ltd. Jaduguda, Jharkhand.
Smelter Plot Plan 65 KTPA To 87 KTPA, Project- Hirakud Smelter Expansion. By Indian Aluminium Co.Ltd.
Hirakud, Orissa.

Foreign Assignment Deputed to Sharjah, as Piping Designer for various Projects :-
Piping for Power plant: Responsible for detail piping engineering for Project: 5th,Frame 6 Gas Turbine Generator, Al Furat Petroleum Company-Syria,Omar Power Plant Extension. Project: Upgrade Of Bu Hasa Production Facilities,Abu Dhabi Company For Onshore Oil Operations-Abhu Dhabi.
Project: Kharyaga Field Development Phase-2,Russia,Total Exploration Production - Russia by Petrofac International Limited, Sharjah (UAE).



From 2000 - 2002
Prepared Pipe routing & Support detailing with interface checking
in PDS of Extraction Steam from LP Turbine to LP Heater #2 of
250MW Lignite Fired Power Plant at Neyveli.


As Sr. Draftsman Rajasthan Atomic Power Project-Units 5&6
(2x220 MWe PHWR),by Nuclear Power Corporation Of India. LTD. for Kaiga Atomic Power Project-Units 3&4 (2x220 MWe PHWR),


Job includes preparation of ISO drawing,pipe modeling Bill of Materials, Support location & detailing & layout drawings finished in Auto CAD.

From 1999 - 2000

As Sr. Draftsman for revamping work of AU III & AU IV, Gujarat Refinery owned by IOCL. Job includes preparation of ISO drawing, Bill of Materials, Support location & detailing & layout drawings finished in Auto CAD.
From 1998 – 1999

As Asst. Piping Project Co-ordinator (Cocker Project) for :-

Material management in Reliance Petroleum LTD, Jamnagar project. Material substitution for late delivery items, handling material databases like Procurement tracking system, etc. Reviewing support & Isometric bill of materials.

From 1996 – 1998

As piping Sr. draftsman for :-

Piping for Quench Section: Responsible for detail piping engineering for Ethylene Project at Haldia Petrochemicals Limited (HPLE), 420 KTA Ethylene Plant, West Bengal.


From 1994 - 1996

Was responsible for detail engineering and checking of G. A. Piping DWG. with P&ID and equipment, Checking of Isometric DWG. and Bill of Material, location of pipe support & preparation of detail pipe Support arrangement DWG. with bill of material for 700 KTA ETHYLENE PLANT of Reliance Industries Ltd. at Hazira, India.


From 1992 - 1994

Was involved in detail engineering and checking with drafting activities for the following :

Preparation of material handling plant layout, detail of chute, conveyor etc, piping layout with support detail.
Bolani Iron Ore Processing Plant, Bolani, Orissa
New Uranium Oxide Fuel Project, Nuclear Fuel


From 1990 - 1992

Was responsible for detail engineering with drafting activities for the following :

Preparation of fabrication details, details of bearing and gear, industrial ventilation, central air-conditioning and refrigerator details, piping and bill of materials.
Hallmark Technical Services Pvt. Ltd., Calcutta
CESC Limited, Victoria House, Calcutta
Metro Railway, Calcutta


From 1988 - 1990

Was responsible for detail engineering and checking with drafting activities for the following :

Preparation of electrical panel box, circuit riveted joint details and bill of materials, details of hydraulic crane with bill of materials, piping with support details and bill of materials.
Techno Craft, Calcutta, Hindustan Motors Ltd.; Hooghly, W. B.


SITE EXPERIENCE :
Field engineering services for Petrochemical Plant Piping of the following projects:

420 KTA Ethylene Plant for Haldia Petrochemical Ltd. At Haldia, WEST BENGAL
700 KTA Ethylene Plant for Reliance Industries Ltd. at Hazira,GUJARAT
Refinery Plant for Reliance Petroleum Ltd. at Jamnagar, GUJARAT.

SOFTWARE EXPOSURE : Auto-CAD (R14, 2000), MICROSTATION 95, CADWORX PIPE 3.1, MS OFFICE 97 (EXCEL, WORD, POWER POINT), MS DOS, PIPEWORKS, PROCUREMENT TRACKING SYSTEM, PAINT SHOP PRO4, EMAIL OPERATION, KNOWLEDGE OF AUTOPLANT, PDS TRAINED.

SEMINARS ATTENDED/
PARTICIPATED : * PDS-Ver.7 by Rolta India Ltd,7/1,Lord Sinha Road, Kolkata-71.
* PSLCAD by Pipe Supports India Pvt.Ltd, 29, Industrial Estate, Perungudi, Chennai-600 096.
* GENSET-Ver.4 by F G Wilson, U.K
* PDMS by AVEVA Information Technology India Pvt. Ltd.
(Subsidiary of CADCENTRE Ltd., U.K.), 47, Dickenson Road, Bangalore- 560 042.

EXTRA CARRICULAR
ACTIVITIES : Music-Vocal-Rabindra Sangeet (Bangiya Sangeet Parishad-WB).

Passed N.C.C Examination in ‘A’ Part I in 1982 and ‘A’ Part II in 1983 and was a member of the Hikking/Trekking Expedition at Dehradun in 1984 conducted by the N.C.C.

Date : 5th July, 2003
Place : Kolkata ( SANTANU DAS MAJUMDAR )


[ Malaysia Online Resume Listing ] [ FAQ ]