pdms/pds+designer/draughtsman+electrical

pdms/pds+designer/draughtsman+electrical


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on June 24, 19103 at 10:34:12:

CURRICULUM-VITAE


NAME : PIYUSH PATEL

PRESENT POSITION : Sr. Draughtsman - Electrical

NATIONALITY : Indian

QUALIFICATION : Two years Diploma Course in Draughtmanship from Industrial training Institute Gandhinagar in the Year 1991.

COMPUTER LITERACY : Familiar with Microstation–95, Setroute, E.M.T.O. (Bechtel Software for cable routing & Electrical Material Take-Off, AUTO-CAD (Release-14) and (Release-2000), WINDOWS ’95’ Environment, Microsoft `EXCEL’, Microsoft `WORD’ Microsoft `Access’.
TRAINING : PDS (Plant Design Systems) & PDMS (Plant Design Management System)

EXPERIENCE : More than 11 years of working experience in the field of design/drafting in various Engineering Consultancy organizations providing consultancy services for Power Plant, Petrochemical Industries, refineries, Offshore and Onshore Projects. Job experience also includes site supervision, CAD/Engineering Software Applications,

Deputation Experience :-

Deputed to Jamnagar-Gujarat (for Reliance Petroleum Ltd. (One of the world’s largest refinery) site office for their field Engineering support of FCC unit from 21ST November 1997 to 15TH May 1999.

Responsibilities include:

Preparation of Cable routing Layout, Tray Sizing, Lighting Layout, Panel schedule Power/Lighting, Grounding Layout, Equipment Layout, Single Line Diagram, Interconnection Diagram, M.T.O. etc.

SINCE JAN 1994 : TRIUNE PROJECTS PVT. LTD. NEW DELHI

Project Associated with :

 Fpso ERHA Nigeria

Preparation of Single line diagram, Area classification drawing, Lighting Layout, Earthing layout, Cable routing layout,Public address system Layout, Block / Interconnection Diagram, Cable Schedule, MTO. Penetration Layout Etc.


 Central Processing Platform No.3 (CPP-3)
Preparation of Single line diagram, Area classification drawing, Lighting Layout, Earthing layout, Cable routing layout,Public address system Layout, Block / Interconnection Diagram, Cable Schedule, MTO. Penetration Layout Etc.

 Barauni Refinery Expansion Project
Preparation of Single line diagram, Area classification drawing, Lighting layout, Earthing layout, Cable routing layout, Cutout layout, Duct Layout, Cable Schedule, MTO. Etc.

 Jamnagar- Loni LPG Pipe line
Preparation of Single line diagram, area classification drawing, lighting layout, earthing layout, overall cable routing layout, Cable Schedule, MTO, Conduit layout etc

 Jamnagar Refinery Project – Reliance Petroleum Ltd., Jamnagar, Gujarat
Engaged in Field Engineering Design for FCC Unit and Propylene Recovery Unit. Job includes revising and completing electrical drawings (lighting layout, cable routing layout, earthing layout, etc.) originally generated by Bechtel, London. Trained to work on SETROUTE (Ver 8.2.0), used for preparing cable schedules, cable raceway schedules, etc. Worked as part of Electrical Core Group. Worked in WINDOWS NTworkstation.

 Floating Production, Storage and Offloading Unit- Marlim Field Development- Brazil (P-33 “Henrique Dias” and P-35 “Jose Bonifacio”)

Preparation of Equipment Layout, Cable Tray Layout, Lighting Layout, Grounding Layout, Cable Schedule, Tray Sizing, Panel Schedule -Power/Lighting for Offshore Project (FPSO) of BRASOIL (BRAZIL) under Hyundai Heavy Industries Ltd.

Two Large Floating Production Storage & Offloading (FPSO) Platforms for BRASOIL (BRAZIL) under HYUNDAI HEAVY INDUSTRIES COMPANY LTD., KOREA

 O.N.G.C., North Santhal,
 B.P.C.L., Mumbai,
 I.O.C.L., Haldia Refinery,
 I.O.C.L., Haldia Refinery,
Preparation of single line diagram, lighting layout, power layout, Interconnection diagram, plot plan, G.A.D.`s etc.

 GE Plastic, Singapore
 Petrosin, Singapore
Preparation of Single line diagram & interconnection diagram

JUN. 93 TO JAN. 94 : DESEIN (I) PVT. LTD., NEW DELHI
Draughtsman-Electrical

Responsibilities include :

Preparation of Electrical Cable Tray Layout, Trench Layout, Cable schedule, Equipment Layout, Earthing Layout, Lighting Layout, Single Line Diagram, M.T.O., Panel Schedule- Power/Lighting, etc.

Project Associated with :
 R.S.E.B., Kota
 Shri Ram Fertilizer & Chemical Ltd. New Delhi,

APRIL 91 TO JUN. 93 : PUNJ-LLOYD LTD., NEW DELHI
Draughtsman - Electrical

Responsibilities include:

Preparation of Electrical GA Drawing, Equipment Layout, Single line diagram,Schematic/Wiring Diagram,Review of Vendor drawing i.e.transformer Layout, Busduct Layout, Earthing Layout, Lighting Layout, Bill of Material etc.

Project Associated with :
 O.N.G.C., Baroda & Santhal,
 I.B.P.L., Wadala, Mumbai,
 G.A.I.L. Salav


NAME : PIYUSH PATEL

DATE OF BIRTH : 12TH NOVEMBER 1971

PASSPORT NO. : B3774817

DATE OF ISSUE : 16TH JANUARY 2002

VALIDITY : 15TH JANUARY 2012

PLACE OF ISSUE : DELHI

CONTACT No. : 011 – 26947718
Piyush1patel@rediffmail.com




[ Malaysia Online Resume Listing ] [ FAQ ]