Piping Stress Engineer

Piping Stress Engineer


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on May 19, 19103 at 13:52:08:

RESUME


Name:
Maurice F. H. Hutabarat

Place /Date of Birth:
Bogor, June 12th, 1972

Education /Degree:
Mechanical Engineering Graduate from University of Indonesia. Final Project: Stress Analysis to Engine Mounting of CN-250 Aircraft Series in PT Indonesian Aerospace (former: IPTN Bandung)

Skill:
Piping Engineering including Stress Analysis, Piping Material Engineering, Construction Support, 3D Modeling, etc.

Languages:
Indonesian, English (TOEIC Score: 730)

Computer Skill:
Microsoft Applications, AutoCAD, Auto PLANT, PDS, Microstation, Caesar II, AutoPipe, etc.

Address :
Kompleks Pesanggrahan Ciputat Blok C3/4, Ciputat 15413, Indonesia
Email: m_fitzgerald1972@hotmail.com

Contact No.:
62-21-7189233 (Office-Direct Line)
62-21-74704439 (Home)
62-818-760238 (Mobile Phone)

Work Experience:
December 2002- Present.
PT Petrosea, Tbk(Engineering, Construction and Mining Company)
As a Senior Piping Engineer: preparing material requisition, material data sheet, pipe stress analysis, vendor technical bid evaluation, piping inspection and test, construction support, etc.

May 2002 – December 2002
PT Nippon Steel Construction Indonesia(Engineering, Procurement and Construction Company-Contract Basis)
As an Assistant Piping Lead: supervising, checking and coordinating engineering subcontractor in detail engineering phase, vendor technical bid evaluation.

July 2001- April 2002
PT Petrosea, Tbk(Engineering, Construction and Mining Company)
As a piping engineer: preparing material requisition, material data sheet, pipe stress analysis, vendor technical bid evaluation, bill of material checker.

June 1997- April 2001
PT. Inti Karya Persada Teknik (Engineering, Procurement and Construction Company)
As a Piping Mechanical Engineer: preparing piping stress analysis, pipe support’s bill of material, man hour/man power estimate, and vendor technical analysis.


PROJECT INVOLVED

PT Petrosea, Tbk
PAGERUNGAN PROJECT
Dec 2002 – Present
PAGERUNGAN INLET COMPRESION AND RECONFIGURATION (BP KANGEAN LTD).
Modification of inlet compressor configuration. Scope of work: Installation new and relocation existing control valves, piping modification, re-analysis piping flexibility, and piping spec. modification.

PT Nippon Steel Construction Indonesia
BONGKOTPROJECT April 2002- December 2002
BONGKOT FIELD DEVELOPMENT PROJECT PHASE 3C (TOTAL THAILAND EXPLORATION AND PRODUCTION).
EPC of offshore facility which is consisted of new Wellhead Platform WP13 and 12” sub-sea line.

PT Petrosea, Tbk
WEST SENO PROJECT Feb. 2002–April 2002
WEST SENO FIELD PRODUCTION AND PIPELINE PROJECT (UNOCAL MAKASSAR LTD).
Onshore inlet facility of West Seno FPSO in Tanjung Santan and 13 km onshore pipeline. Capacity 145 MMSCFD and 60,000 bpd.

BANYU URIP PROJECT PROPORSAL Nov. 2001– Feb. 2002
BANYU URIP DEVELOPMENT PROJECT (MOBIL CEPU LTD).
This field will produce 165,000 bpd crude oil and 26 ton/day sulfur after sweetened in LO-CAT unit. The project consists of: Initial Production Facilities, Central Processing Facilities, FSO vessel and pipeline.

PAGERUNGAN PROJECT Sept. 2001 – Dec. 2001
BTX ELIMINATION PROJECT (BP KANGEAN LTD).
Installation new Blower unit and Recycle Cooler unit. Blower is used to pressurize the gas and directed the gas to existing HP flare header.
Position: Lead of Piping Engineer

KAKAP PROJECT July 2001 – August 2001
KAKAP GENERAL ENGINEERING SERVICE (GULF RESOURCES INDONESIA).
Modification, development and new instalation for Kakap Platforms.

SHOUT JAMBI PROJECT PROPORSAL July 2001 – October 2001
SOUTH JAMBI “B” SHALLOW GAS PROJECT (GULF RESOURCES INDONESIA).
Development of New Gas Processing Facility which consists of Compressor unit with capacity 24 MMSCFD, LTS, Condensate Stabilizer, Storage, Flare System and Pipeline.

PT. Inti Karya Persada Teknik
PECIKO PROJECT PROPOSAL February 2001 - April 2001
TRAIN C EXPANSION PROJECT PHASE III, SENIPAH (PT TOTAL INDONESIE).
Position: Lead of Piping Mechanical

CGS-10 November 1999 – July 2000
OIL CENTRAL GATHERING STATION-10 PROJECT (PT CALTEX).

LNG PLANT TRAIN-H H
August 1997 – May 1999
TRAIN-H, BONTANG (PT BADAK NGL).
Development of Onshore facility which consist of Process, Utility and Storage of 8th LNG plant owned by PT Badak NGL.


IMPROVEMENT
ON JOB TRAINING PROGRAM
November 1998 – February 1999
april 1998 – July 1998
OVERSEAS TRAINING PROGRAM. Piping Design Course in CHIYODA CORPORATION-JAPAN (certified)
PDS COURSE. 3D Modeling course in CHIYODA CORPORATION-JAPAN (certified)

OTHER COURSE
BASIC AND ADVANCE AUTOPLANT TRAINING 3D Modeling software course by REBIS (August 1998 – October 1998) (certified)
PDS 3D MODEL ADVANCE TRAINING (April 2001 – July 2001) by Indograf Teknotama (INTERGRAPH INDONESIA)


[ Malaysia Online Resume Listing ] [ FAQ ]