Senior Piping Stress Engineer/Principal Piping Design Engineer

Senior Piping Stress Engineer/Principal Piping Design Engineer


[ Malaysia Online Resume Listing ] [ FAQ ]

Posted by on May 09, 19103 at 16:08:21:

RESUME

NAME: MR. LYNDON P. SIA
POSITION: LEAD PIPING STRESS ENGINEER/PRINCIPAL PIPING DESIGN ENGINEER
BORN: SEPTEMBER 15, 1966
NATIONALITY: FILIPINO
STATUS: MARRIED
QUALIFICATIONS: BSME, REGISTERED MECHANICAL ENGINEER
LANGUAGES SPOKEN: ENGLISH, TAGALOG, CEBUANO, ILONGO
COMPUTER KNOWLEDGE: WINDOWS XP/NT VER.5, MS OFFICE2000, AUTOCAD, PDS INTERGRAPH, PDMS, CAESAR II, AUTOPIPE, MICROSTATION.

FIELD OF EXPERIENCE: OIL REFINERIES, PETROCHEMICAL PLANT, POWER PLANT, ONSHORE OIL PRODUCTION AND INDUSTRIAL PLANT WITH KNOWLEDGE IN ASME B31.1, B31.3, B31.4, B31.8, AND STOOMWEZEN.

CAREER SUMMARY:
SINCE COMPLETING SUMMER JOB TRAINING FROM 1987 TO 1988 HAS OBTAINED 15 YEARS EXPERIENCE IN PLANT PIPING DESIGN.

HALLIBURTON KBR (AZERBAIJAN): JOINED HALLIBURTON KBR COMPANY AZERBAIJAN IN JANUARY 2002 AS A SENIOR PIPING STRESS ENGINEER.

ACG PHASE 1 FULL FIELD DEVELOPMENT PROJECT:
(ONSHORE PLANT)
PIPING STRESS ANALYSIS USING CAESAR II VER 4.3. STRESS ANALYSIS AROUND PRESSURE VESSELS LIKE TOWERS, DRUMS, HEAT EXCHANGERS, AIR COOLERS, PUMPS, 3 STAGE COMPRESSORS, API 650 TANKS, DESIGN OF SUPPORTS LIKE TRUNNION, AND BRACKETS, FLANGE LEAKAGE , LOADING INFORMATION FOR AIRCOOLERS, PIPERACKS, COMPRESSORS, FOR STRUCTURAL CALCULATION.


PREVIOUS WORK HISTORY:

ABB LUMMUS ALIREZA LTD
SAUDI ARABIA/HOLLAND/CZEC REPUBLIC
POSITION: PRINCIPAL PIPING STRESS ENGINEER/PIPING DESIGN ENGINEER
GRADE: ARAMCO ENGINEER E-13
DURATION: JANUARY 2000-JANUARY 2002

PO-11 LYONDELL PROJECT (ABB LUMMUS GLOBAL CZECH REPUBLIC)
ASSIGNED IN CZECH REPUBLIC FOR SIX MONTHS AND STILL WORKING AT PRESENT IN CZECH REPUBLIC. PIPING STRESS ANALYSIS AROUND REACTORS, COLUMNS, DRUMS, EXCHANGERS, PUMPS AND COMPRESSORS. DESIGN OF PIPE SUPPORTS, SPRINGS, STRUTS, STRUCTURAL AND CIVIL INFORMATION, AND VESSEL PIPE SUPPORT CLIPS. PREPARATION OF DATA SHEETS, CALCULATION OF VESSEL SUPPORT CLIPS, STANCHION AND LUGS. DESIGN STANDARDS TO ASME B31.1, B31.3 AND STOOMWEZEN.

KHUFF CONDENSATE SEGREGATION AND PROCESSING FACILITIES PROJECT (ARAMCO SAUDI ARABIA)
EQUIPMENT LAYOUT OF PUMPS AND PRESSURE VESSELS, PIPING LAYOUTS, PIPING STRESS ANALYSIS AROUND PUMPS , COLUMNS, EXCHANGERS, PIPE SUPPORT DESIGN, LOADING INFORMATION TO STRUCTURAL.

SAUDI EUROPIAN PETROCHEMICAL COMPANY, COMMON FACILITY UPGRADE (UNIT 710/UNIT 740)
EQUIPMENT LAYOUT OF COMPRESSOR PACKAGE AND EXCHANGERS IN UNIT 740 AND EQUIPMENT LAYOUT OF FILTERS IN UNIT 710. PIPING LAYOUT FOR UNIT 710 AND UNIT 740. PIPING STRESS ANALYSIS FOR UNIT 710/UNIT 740. PREPARE DEMOLITION DRAWINGS, TIE-IN SCHEDULE, HYDROTEST DIAGRAM, GENERAL ARRANGEMENTS, UPDATE PLOT PLAN, KEY PLAN, ISOMETRICS AND MATERIAL TAKE-OFF.

FLUOR DANIEL, INC. PHILS.
ASEAN STAR BLDG.
ALABANG MUNTINLUPA
POSITION: LEAD PIPING STRESS ENGINEER
DURATION: SEPTEMBER 1998 - JANUARY 2000

BASIC STRESS TRAINING FOR THE DESIGNERS.
CONDUCTED BASIC STRESS TRAINING TO PIPING DESIGNERS AND CONDUCTED PIPE SUPPORT CLINICS TO ALL OF THE PIPING DESIGNERS.

PBB-LHC2 ETHANE CRACKER DOW CHEMICALS, HARLEM, USA.
PIPING STRESS ANALYSIS OF VARIOUS EQUIPMENTS LIKE PUMPS AND CENTRIFUGAL COMPRESSOR, PRESSURE VESSELS , TOWER AND HEAT EXCHANGERS.

IRVING OIL LTD, REFINERY UPGRADE, ST. JOHN, CANADA(RFCCU)
PIPING STRESS ANALYSIS OF COLUMNS AND DRUMS, PUMPS, TURBINES, EXCHANGERS AND AIR COOLERS.

KODAK CHINA PROGRAM:
PIPING STRESS ANALYSIS OF MAIN STEAM AND CONDENSATE UTILITY LINES AND VARIOUS PIPING SYSTEMS IN THE BOILER AND UTILITY AREAS. STRESS ANALYSIS OF ROTATING AND STATIC EQUIPMENTS SUCH AS PUMPS AND PRESSURE VESSELS.


PETROCON ARABIA LTD.
AL KHOBAR SAUDI ARABIA
POSITION: LEAD PIPING STRESS ENGINEER
DURATION: JUNE, 1997 – AUGUST, 1998


KHUFF GAS FLOWLINE (12 OIL WELLS AND FLOWLINES) PROJECT:
PREPARATION OF TRUNKLINE AND FLOWLINE SAFETY INSTRUCTION SHEETS, PRESSURE DROP CALC ,LINE SIZING AND STRESS ANALYSIS OF THE TRUNKLINE AND FLOWLINE.


HAWIYAH 206 TO HAWIYAH GOSP-2 FLOWLINE PROJECT:
PREPARATIONS OF FLOWLINE SAFETY INSTRUCTION SHEETS, PRESSURE DROP CALC., LINE SIZING AND PIPING STRESS ANALYSIS OF THE OIL WELL LINES AND PROCESS LINES.


PRESSURE SAFETY VALVES UPGRADING AT RIYADH REFINERY:
PIPING STRESS ANALYSIS OF RELIEF VALVE SYSTEM, PRESSURE DROP CALC., LINE SIZING AND DESIGN OF SUPPORTS.


SAUDI ARABIAN CONSOLIDATED ELECTRIC COMPANY POWER PLANT #9 PROJECT:
PIPING STRESS ANALYSIS OF VARIOUS PIPING SYSTEMS AND DESIGN OF SUPPORTS IN THE SINGLE AND COMBINED CYCLE OF THE POWER PLANT.

FLUOR DANIEL INC.
MANILA DESIGN OFFICE
9TH FLOOR PACIFIC STAR BLDG.
MAKATI AVENUE, MAKATI CITY
POSITION: PIPING STRESS ENGINEER
DURATION: JUNE, 1996 – JUNE, 1997

AIR PRODUCTS 112 MW COGEN PROJECT OF THAILAND
STRESS ANALYSIS OF VARIOUS PIPING SYSTEMS. PREPARATION OF PRE-ENGINEERED ITEMS AND STRESS CALCULATIONS BY CAESAR II.


AIR PRODUCTS BIG III ASU AND LIQUEFIER PROJECT OF THAILAND
LAYOUT OF PIPING AROUND COMPRESSOR, PUMPS AND VESSEL.
DEVELOP PIPING MATERIAL SPECIFICATION FOR PDS INTERGRAPH APPLICATION.
LAYOUT OF LOADING AND UNLOADING PIPING SYSTEMS OF ARGON, OXYGEN AND NITROGEN. DEVELOP PIPING ISOMETRICS OF JACKETED PIPING FOR THE LOADING AND UNLOADING AREA.


STRESS ANALYSIS TRAINING AND SEMINAR BY R.U.GARCIA(IRVINE BASED EXPAT)
• RESPONSIBILITIES OF STRESS ENGINEER
• FUNDAMENTALS OF PIPING STRESS ANALYSIS
• THEORY OF PIPE STRESS ANALYSIS
• WELD JOINT QUALITY FACTOR
• CANTILEVER DESIGN THEORY
• PIPERACK LAYOUT
• TRAINING SYLLABUS
• LAYOUT AIDS FOR PIPEWAY
• TRANSFERRING OF MOMENTS TO EQUIPTMENT NOZZLES
• NEMA SM 23 FOR TURBINE AND COMPRESSORS
• API 610 6TH AND 7TH EDITION
• PIPING SUPPORT DETAILS FOR EQUIPMENT
• FLEXIBILITY ANALYSIS FOR FIRED HEATERS, EXCHANGERS, VESSELS, COLUMNS, TANKS, AIR COOLERS, PUMPS, TURBINES, CENTRIFUGAL COMPRESSOR AND RECIPROCATING COMPRESSORS.
• MIXING TEE REQUIREMENTS
• TANK NOZZLE DEFLECTION
• WELDING RESEARCH COUNCIL 107 AND 297
• TYPES OF VIBRATION
• STATIC AND SEISMIC CALCULATION
• SUPPORT SPACING FOR DYNAMIC SITUATION AND FREQUENCY CHARTS
• ALLOWABLE PIPE SPAN FORMULA
• DESIGN OF SPRING HANGERS AND SUPPORTS
• BURIED PIPING
• JACKETED PIPING
• DESIGN OF JOINTS
• WATER HAMMER ANALYSIS
• DYNAMIC INPUT DATA CHECKING
• DESIGN OF FLANGES

PARSON’S INTERNATIONAL LTD.
LOCATION: MAKATI DESIGN OFFICE
PROJECT: COLUMBIAN CARBON PHILIPPINES DEBOTTLENECKING PROJECT
DURATION: 1996
POSITION: PIPING DESIGN ENGINEER
CONSTRUCTIBILITY STUDIES FOR THE PUMPS, EXCHANGER, COMPRESSOR AND PIPING. DEVELOP PLOT PLAN AND EQUIPMENT DEMOLITION PLAN. PIPING STRESS ANALYSIS OF VARIOUS PIPING SYSTEMS. DESIGN STUDIES AROUND PUMPS, TANKS, EXCHANGER, AND COMPRESSORS. EQUIPMENT NOZZLE ORIENTATION AND PIPING ISOMETRICS FOR SHOP AND FIELD FABRICATION.


SANKO ENGINEERING CORPORATION :
LOCATION: PULAU MERBAU, SINGAPORE
PROJECT: PETROCHEMICAL DEBOTTLENECKING PROJECT
DURATION: 1995
POSITION: PIPING DESIGN ENGINEER/ENGINEERING SUPPORT GROUP
DESIGN REVIEW OF LAYOUTS AND ISOMETRICS AND ISSUE FOR CONSTRUCTION. PIPING STRESS ANALYSIS OF VARIOUS PIPING SYSTEMS USING AUTOPIPE. PREPARE FIELD CHANGE ORDER AND SITE VERIFICATION. HYDROTEST DIAGRAMS , SCHEDULING AND LINE CHECKING.


SANKO ENGINEERING CORPORATION:
LOCATION: MAKATI DESIGN OFFICE
PROJECT: PMO OFFSITE AND UTILITIES PROJECT
DURATION: 1994-1995
POSITION: PIPING DESIGN ENGINEER
PREPARE DEMOLITION DRAWINGS FOR TIE-IN. DESIGN STUDY OF FLARE KNOCKOUT DRUM , TANKS AND PUMPS. PREPARE NOZZLE ORIENTATION, PLATFORM AND LADDER. DESIGN STUDY AT MAIN PIPERACK. PIPING STRESS ANALYSIS OF VARIOUS PIPING SYSTEMS. PREPARE LOADING INFORMATION AROUND EQUIPMENT, SUPPORTS, AND PIPERACK. PREPARE DETAILED ISOMETRICS FOR SHOP AND FIELD FABRICATION. PREPARE HYDROTEST DIAGRAMS AND TIE-IN SCHEDULES.

AS-BUILTING OF OLEFINS PLANT OF NIGERIA PETROCHEMICAL PLANT:
AS-BUILTING OF NIGERIAN PETROCHEMICAL PLANT. APPLYING INFORMATION TO GA’S AND SUBMIT THE DWGS. TO JAPAN.

NUCLEAR WASTE DISPOSAL SYSTEM, POOL WATER PURIFICATION SYSTEM, AND WASTE RESIN STORAGE SYSTEM:
DETAILING OF THE VARIOUS AREAS FOR SHOP AND FIELD FABRICATION.


BECHTEL COMPANY:
LOCATION: AL-KHOBAR SAUDI ARABIA
DURATION: 1992-1994
POSITION: PIPING DESIGNER

ARAMCO PUMP STATION PROJECT:
PREPARE DEMOLITION DRAWINGS AND TIE-IN SCHEDULE. DESIGN STUDY AROUND TANKS AND PUMPS. PREPARE EQUIPMENT NOZZLE ORIENTATION, AND STAIRWAY. PREPARE GENERAL ARRANGEMENT, MATERIAL SPECIFICATION, ISOMETRICS FOR SHOP AND FIELD FABRICATION. HYDROTEST DIAGRAM.

ARAMCO SAND SEPARATOR BASIN PROJECT:
DESIGN STUDY AROUND SAND SEPARATOR. PREPARE GENERAL ARRANGEMENT, MATERIAL SPECIFICATION, ISOMETRIC DETAILING, HYDROTEST DIAGRAM AND TIE-IN SCHEDULE.

ARAMCO HAWIYAH GAS-OIL SEPARATION PLANT PROJECT:
AS-BUILTING OF GENERAL ARRANGEMENT THROUGH THE USE OF INTERGRAPH. TRANSFERING FIELD CHANGES. MATERIAL TAKE-OFF AS PER ARAMCO MATERIAL SYSTEM.

JEDDAH LUBE REFINERY FLARE AND TANK PROJECT:
PREPARE DEMOLITION GA’S, ISOMETRICS AND P&ID. DESIGN STUDY FOR FLARE KNOCKOUT DRUM AND PUMPS. ORIENT EQUIPMENT NOZZLE , PLATFORM AND LADDER. PREPARE GA’S AND ISOMETRIC FOR SHOP AND FIELD FABRICATION. SITE SURVEY. PREPARE MATERIAL TAKE-OFF. PREPARE PIPE SUPPORT DESIGN FOR FLARE PIPING. PREPARE TIE-IN SCHEDULE. STRESS SKETCH. STEAM TRACE DIAGRAM AND HYDROTEST DIAGRAM.

SAMAREC ITB PACKAGE FOR LOADING AND UNLOADING FACILITIES, STORAGE TANKS AND FIRE FIGHTING SYSTEMS:
DESIGN STUDIES AROUND LOADING , UNLOADING, TANKS, PUMPS AND FIREFIGHTING SYSTEMS. NOZZLE ORIENTATION AROUND TANKS, PLATFORMS AND LADDER. MATERIAL TAKE-OFF AND TIE-IN SCHEDULE.

ARAMCO RELOCATION OF BOILER BLOWDOWN:
DESIGN STUDIES OF BOILER BLOWDOWN PIPING. PREPARE DEMOLITION DRAWINGS ON GA’S, ISOMETRICS, AND P&ID. PREPARE GA’S, MATERIAL SPECIFICATION, ISOMETRICS, TIE-IN SCHEDULE, STRESS SKETCH, AND HYDROTEST DIAGRAM.

JAPAN GASOLINE CORPORATION:
LOCATION: PULAU MERLIMAU, SINGAPORE
DURATION: 1991-1992
POSITION: FIELD DESIGNER

SINGAPORE REFINING COMPANY DEBOTTLENECKING PROJECT:
DESIGN STUDIES OF PIPING AROUND COMPRESSOR, TOWER. PREPARE DEMOLITION DRAWINGS ON GA’S, ISOMETRICS, AND P&ID. PREPARE HYDROTEST DIAGRAM. PIPE SUPPORT DESIGN. LOADING INFORMATION AROUND PLATFORM AND SUPPORTS. MATERIAL TAKE-OFF , FIELD CHANGE ORDER, AND STEAM TRACING DRAWINGS, AND LINE CHECKING.

JAPAN GASOLINE CORPORATION:
LOCATION: TSINGYI, HONGKONG
DURATION: 1990-1991
POSITION: FIELD DESIGNER

HONGKONG SHELL LUBE OIL BLENDING PLANT:
PIPING DESIGN REVIEW OF GA’S AND ISOMETRICS FOR SHOP AND FIELD FABRICATION. PREPARE TEST FLOW PACKAGE. FIELD CHANGE ORDER, PIPE SUPPORT DESIGN, LINE CHECKING AND PIPE SUPPORT DESIGN.


TECHNOSERVE INT’L. COMPANY:
LOCATION: MAKATI DESIGN OFFICE
DURATION: 1989-1990
POSITION: PIPING DESIGNER

SKIKDA REFINERY NAFTEC ALGERIA PROJECT:
DESIGN STUDIES OF PUMPS AND TURBINES AND TANKS. EQUIPMENT NOZZLE ORIENTATION, PLATFORM AND LADDER. PREPARE MATERIAL TAKE-OFF. LOADING INFORMATION AROUND TANKS AND SUPPORTS. PREPARE GA’S AND ISOMETRICS FOR SHOP AND FIELD FABRICATION. PREPARE HYDROTEST DIAGRAM AND STEAM TRACING DRAWINGS.


FLUID CATALYTIC CRACKER OF RUSSIA PROJECT:
DESIGN STUDIES OF PUMPS, TURBINES AND TANKS. PREPARE EQUIPMENT NOZZLE ORIENTATION, PLATFORM AND LADDER. PREPARE GA’S , MATERIAL TAKE-OFF AND ISOMETRICS FOR SHOP AND FIELD FABRICATION. PREPARE HYDROTEST DIAGRAM. SUPPORT DESIGN. LOADING AROUND SUPPORT AND EQUIPMENT. STEAM TRACING DRAWINGS.

OAR HYDROCRACKING PROJECT OF TURKEY:
DESIGN STUDIES AROUND VESSEL AND EXCHANGER, PUMPS AND TURBINES. PREPARE NOZZLE ORIENTATION, PLATFORM AND LADDER. PREPARE DEMOLITION GA’S, ISOMETERICS AND P&ID. PREPARE GA’S, MATERIAL TAKE-OFF AND ISOMETRICS FOR SHOP AND FIELD FABRICATION. LOADING INFORMATION AROUND EQUIPMENT AND SUPPORTS. PIPE SUPPORT DESIGN. HYDROTEST DIAGRAM, TIE-IN SCHEDULE AND STEAM TRACING DRAWINGS.

ATLANTIC GULF AND PACIFIC CO.
LOCATION: MAKATI DESIGN OFFICE
DURATION: 1987 & 1988 SUMMER JOB TRAINING
POSITION: PIPING DESIGNER, DETAILER AND DRAFTSMAN

BAHRAIN NATIONAL GAS PROJECT:
PREPARE GA’S, MATERIAL TAKE-OFF, AND ISOMETRICS FOR SHOP AND FIELD FABRICATION.

OIL AND GAS PROJECT OF INDIA:
PREPARE GA’S, MATERIAL TAKE-OFF AND ISOMETRICS FOR SHOP AND FIELD FABRICATION.

SINCERELY YOURS,

MR LYNDON P. SIA
Lyndon_sia@hotmail.com
Don_sia@hotmail.com
Tel # - 63-35-4199470
Tel # - 63-917-7403877
Tel # - 63-916-7000105


[ Malaysia Online Resume Listing ] [ FAQ ]