Posted by on February 26, 19101 at 03:09:02:
Subject: Application for the post of Quantity Surveyor.
Dear sir ,
In response to your advertisement in inter-net, So I offer myself as one of the candidates for the post of Quantity Surveyor in your concern.
I have passed certificate level (Diploma in Engineering) from Institute of Engineering Campus, Pulchowk, Kathmandu, Nepal. in first division.
I am 39 years of age, having an excellent health. I have worked on several National and International Consultant and Construction Companies in different types of Engineering field since 18th years.
I am a hard working man and am capable of working for long hours after the office time if there is needed.
I am enclosing herewith my service certificate (Resume) which speaks of my good record and efficient working.
Sir, I wish to assure you that, if I am selected, I shall leave no stone unturned to prove myself worthy of my selection.
Thanking you.
Yours faithfully
Gurung Devi Jang
CURRICULUM VITAE
NAME : GURUNG DEVI JANG
DATE OF BIRTH : 1962
MARITAL STATUS : Married
ADDRESS : P.O.Box 10715
Kathmandu
Nepal.
Phone:977-1-524245
e-mail : djg@mos.com.np
NATIONALITY : Nepali
ACADEMIC QUALIFICATION : Passed certificate level (Diploma in Engineering) from INSTITUTE OF ENGINEERING CAMPUS Pulchowk, Kathmandu, Nepal in First Division.
Passed School Living Certificate in highest 2nd Division. From SLC Board Nepal.
O. QUALIFICATION : Diploma in Computer (Basic Course)
LANGUAGE : Nepali, English, Hindi and Gurung.
WORK EXPEIRIENCE :
Aug. 1991 to Cont.
Employer
Position
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
Dec. 1998 to Till Date
Project (Under Construction)
Employer
Position
Duties and Responsibilities
Tribhuvan International Airport Hanger Area Improvement Project ( Phase # 3)
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Management for all site.
– Controlling the all staffs.
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern.
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
–
June 1997 to Nov. 1998
Project
Employer
Position
Duties
EROM - 2, RC-5 Charali - Durgapur, Jhapa Highway Project.
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Management for all site.
– Controlling the all staffs.
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern.
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
Nov. 1996 to June 1997
Project
Employer
Position
Duties
Jan. 1995 to Jul 1996
Project
Employer
Position
Duties
Reconstruction of Samari Bridge
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Management for all site.
– Controlling the all staffs.
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern.
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
Prithvi Highway Flood Damage Repair. Project Package # 15, 20
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Management for all site.
– Controlling the all staffs.
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern.
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
Aug 1991 to Dec. 1994
Project
Employer
Position
Duties
Charali to Ilam Road Project
M. K. Nirman Sewa (Pvt.) Ltd.
Site Engineer/ Quantity Surveyor
– Site supervision : (Quality Control, Surveying, Leveling and Layout of different type of structures as concern).
– Preparation of work schedule.
– Preparation of shop drawing.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
July 1992 to Jun 1991
Employer
Project
Position
Duties
Jan. 1984 to Jul 1990
Employer
Jul 1987 to Jul 1990
Employer
Project
Position
Duties Responsibilities
Dec. 1986 to Jul. 1987
Employer
Project
Position
Duties Responsibilities
CEGELEC CONSTRUCTION COMPAY FRANCE
132 KV Transmission line, Nepalgunj to Mahendranagar.
Surveyor and Civil Work Inspector for Attaria and Mahendranagar sub-station buildings.
Layout, Leveling, Quality Control, Preparation of Construction Sub-Drawing and Supervision of all Types of Structures such as : Sub-Station Building, Foundation Blocks, Cable Duct, Drainage, Road (Internal Access), Culverts, Brick Works, Plastering, Painting, Sanitary, Terrazzo Flooring, Septic Tanks, Transformer Foundation, and Reactor Foundation etc.
– Preparation of work schedule.
– Preparation of Monthly Progress Report.
– Preparation of Running Bills etc.
CEMAT Consultant (P) Ltd. Nepal.
Renardet Consulting Engineers S.A. Switzerland. in associate with CEMAT Consultant (P) Ltd. Nepal.
Nepal Feeder Road Project (Financed by Asian Development Bank (ADB) located at Far Western Region, Nepal. (CH. 000+000 to CH. 101+500 km Godavari to Bhatkanda Contract # 2 Construction Phase)
Quantity Surveyor
Survey, Preparation of Construction Drawing, Quality Control.
Checking of Monthly Certificates which is submitted by Contractor Korean Development Corporation known as KDC
Construction Supervision such as : Bridge, Box Culvert, Slab Culvert, Pipe Culvert.
Protection Works : Gabion Works, Masonry Works, Drainage etc.
Road Pavement Works : Sub-Base, Base-Course and Black-Top and Land Slide Protection Works etc.
In this alignment near by CH. 4+000 km. Due to heavy land slide changed the new alignment about 2+700 km completed all detail survey, Plotting, Estimating etc. by myself.
Luis Berger International Inc. USA and Renardet Consulting Engineers S.A. Switzerland in associat with CEMAT Consultant (P) Ltd. Nepal and EAST Consultant (P) Ltd. Nepal.
Nepal Feeder Road Project (Financed by Asian Development Bank (ADB) located at Far Eastern Region, Nepal.
Quantity Surveyor
Feasibility and Geotec Survey in Eastern Region from Gaighat-Diktel and Chatara to Bhojpur.
Busy in office with drafting works, plotting and calculation of all field books and related works.
Jan. 1986 to Dec.1986
Employer
Project
Position
Duties Responsibilities
CEMAT Consultant (P) Ltd.
Hadetar Irrigation Project Lamjung, Nepal.
Nepal Rastra Bank Building, Dhangadhi, Far West Nepal.
Quantity Surveyor
Detail Survey in field :
Office Work : Calculating, Plotting, Drawing and related works of Haditar Irrigation Project.
Estimating and Drawing of Nepal Rastra Bank.
Design, Drawing and Estimating for Residential Buildings.
May 1985 to Jan. 1986
Employer
Project
Position
Duties Responsibilities
Renardet Consulting Engineers S.A. Switzerland. in associate with CEMAT Consultant (P) Ltd. Nepal.
Nepal Feeder Road Project
Quantity Surveyor
Detail Survey in Far Western Region, Godawari to Bhatkanda and Bhatkanda to Dipayal.
Topographical Survey, Calculating, Quantity Estimating, Drawing, Plotting of L-Section, X-Section and related works.
Jan. 1984 to May 1985
Employer
Project
Position
Duties Responsibilities
CEMAT Consultant (P) Ltd. Nepal.
Mahakali Irrigation Project, Far Western Region, Mahendranagar, Nepal.
Bhaktapur Surface Drainage.
Quantity Surveyor
Calculating, Plotting, Drafting, Estimating and related works.
Design, Drawing and Estimating of Residential Buildings.
Jan. 1983 to Jan. 1984
Employer
Project
Position
Duties Responsibilities
HMG Public Work Development Section, (Jomsom Mustang) located at North West Remote Place.
Local Projects (Finance by Local Source of HMG Nepal).
Sub-Overseer
Survey, Design, Estimating of Office Building, Health Center Building, Renovation of Historical Temples such as (Muktinath Temple), Water Supply, School Building, Local Wooden Bridges, River Protection Work, Irrigation, Landslide Protection, Mule-Track, etc.
All the mentioned Projects are constructed under supervision of this office. As a member of this office I am directly involved.
Subject : Application for the post of Quantity Surveyor.
Dear Sir,
In reply to the advertisement dated .............. on Inter net. I would like to submit my application for the Quantity Surveyor. I have passed my certificate (Diploma) level in civil engineering from the Institute of Engineering Kathmandu, Nepal on 1980. I have worked on several national and international consultants and construction company in road, irrigation and 132 KV transmission line project of Nepal. I have attached my resume. Please see the attachments for the details. I shall be very much obliged for your kind co-operation.
Thanking you in anticipation.
Sincerely yours
Giri Bhupendra
CURRICULUM VITAE
NAME :
DATE OF BIRTH :
MARITAL STATUS :
NATIONALITY :
ADDRESS :
ACADEMIC QUALIFICATION :
WORK EXPERIENCE :
June 1999 to Till Date
Employer
Position
Duties and Responsibilities
Jun. 1996 to Dec.1999
Employer
Position
Duties and Responsibilities
Nov. 1993 to May 1996
Employer
Position
Duties and responsibilities
Jan. 1992 to Nov. 1993
Employer
Position held
Duties and responsibilities
June 1992 to Aug. 1992
Employer
Position
Duties and responsibilities
June 1990 to Nov. 1992
Employer
Position
Duties and responsibilities
Nov. 1988 to 1990
Employer
Position held
Duties & responsibilities
Jan. 1998 to Nov. 1988
Employer
Position
Duties & responsibilities
Feb. 1983 to Oct. 1887
Employer
Position
Duties and responsibilities
Oct. 1982 to Feb. 1987
Employer
Position held
Duties and responsibilities
Nov. 1980 to Oct. 1981
Employer
Position
Duties and responsibilities
PERSONAL ACHIEVEMENTS
Other abilities
Language
Computer Skill
GIRI BHUPENDRA
30th September 1960
Married
Nepali
Kaushaltar, Kathmandu
Telephone : 977-1-631820
e-mail : djg@mos.com.np
Certificate on Engineering from Tribhuwan University in 1980
School Living Certificate SLC Board Nepal in 1978.
SILT-SSC-MEH Consultants, Arniko Highway Project (Phase-III Km 14 Km to 30 Km)
Sr. Surveyor/Quantity Surveyor
Construction supervision, survey and measurement of roads pavement works and off road structures.
Major duties:
– Construction supervision under FIDIC contract document.
– Checking of lines and levels of road pavement, river training works, retaining structures causeway, slab culvert and gully control works.
– Measurement of constructed structures.
– Preparation of construction drawing.
– Prepare data of progress for Resident Engineer.
SILT-SOIL-TEST-MULTI Consultants Arniko Highway Project (Phase-II Km 57 Km to 89 Km)
Sr. Surveyor/ Quantity Surveyor
Construction supervision, survey & measurement of roads Pavement works and off road structures.
Major duties:
– Construction supervision under FIDIC contract document.
– Checking of lines and levels of road pavement, river training works, retaining structures causeway, slab culvert and gully control works.
– Measurement of constructed structures.
– Preparation of construction drawings.
– Prepare data of progress for Resident Engineer.
NEDECO, SILT, TAEC & BDA Consultants
Sunsari Morang Headwork Project (East Nepal)
Sr. Surveyor/Quantity Surveyor
Survey and layout of Mini Hydropower Station (3MW) with control building reinforcement concrete intake structure, guide vanes in the river, a 1090 m long reinforced concrete culvert, a 300m long presetting basin with diaphragm wall at river side, a new flushing structures, 120 nos, anchor poles & Dry Dock for dredges plant and water supply intake reservoir.
SILT Consultant (P) Ltd.
Sr. Surveyor
Detail survey of Arniko Highway Rehabilitation Project from Dhulikhel to Dolalghat (Km 30 to 57 Km)
Detail survey of Dumre Beshishahar Road Upgrading Project (44 Km)
Detail survey of Bhaktapur City Drainage Systems
Lutheran world survive with East Consultants (P) Ltd. for Bhutanese Refugees Relief Project East Nepal, Jhapa.
Sr. Surveyor
Construction supervision of access road, infrastructure, water supply system, drainage system, permanent hospital building and refugees buildings.
CEGELEC (France)
Surveyor
Detail construction supervision and layout and measurement of three control building (450 Sq.m) switch Yard civil work, drainage and water supply system and access road.
RENARDET Consultants with association to CEMAT Consultants (P) Ltd. for Feeder Road Project Contract # 2 (Dhangadi-Godawari to Dandeldhura West Nepal 102 Km)
Quantity Surveyor
Construction supervision and Quantity measurement of RCC box culverts (20 nos), pipe culvert (50 nos) earth excavation, earth filling for road embankment, gabion masonry wall for protection, sub grade, sub base and base course.
Korea Development Co. Contractor for Feeder Road Project Contract # 1 (Charali-Ilam) East Nepal.
Surveyor
Survey of roads alignment, cross section, layout of 180m long bridge, box culverts and pipe culverts. Preparation of monthly progress bill for payment.
LUNA Consultant and Construction Co., (P) Ltd.
Surveyor
Detail survey work of Second Hill Irrigation Project West Nepal for design and calculation of total project cost.
Detail survey works of Pinguwa irrigation project Tehrathum East Nepal for design and calculation of total project cost.
Navin Construction Co. (P) Ltd.
Trishuli Somdang Road Project (Mid Nepal)
Surveyor
Construction supervision and survey layout of road center line, gabion masonry structures and pipe culverts.
Preparation of monthly progress bill for payment
Department of Road
Dandeldhura Doti Road Project
Surveyor
Survey construction supervision of new road alignment survey, measurement and bill preparation for pavement to contractors.
English, Nepali and Hindi
Diploma in Basic Computer Course.
I hope confirm that the information mentioned above are true and correct.
Yours sincerely,
GIRI BHUPENDRA
Yours Faithfully,
GURUNG DEVI JANG